Kispiox River Watershed Stewardship Decision Support Tool
Results of the 2023 Equivalent Clearcut Area (ECA) analysis at six Watershed Management Levels (WMLs) for the Kispiox River Watershed with respect to Peak-Flow-Sensitivity (PFS) thresholds for risk categorization. The analysis was completed for SkeenaWild... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency... -
Level I Detailed Field Assessment of Aquatic and Riparian Habitat for Coldwat...
The Watershed Restoration Program of British Columbia is a program whereby watersheds that have been damaged by past logging practices undergo restoration. The program involves a number of steps that commence with an overview study, followed by a detailed... -
Environmental and Socio-Economic Effects Report
This report is part of BC Hydro's transmission line from Terrace to Kitimat planning process to identify potential Project effects and proposed mitigation for biophysical or socio-economic study topic. -
Wild Salmon Policy Indicator Analysis for the Kispiox TSA
Wild Salmon Policy indicators including road density, stream crossing density, riparian disturbance, and anthropogenic total land cover alternation (TLCA) were calculated for the Kispiox Timber Supply Area (TSA) using BC freshwater atlas (FWA) assessment... -
Wet'suwet'en Submission to the Canadian Environmental Assessment Agency - Pac...
This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific NorthWest LNG project near LeLu Island. -
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect of the proposed Northern Gateway project within Wet'suwet'en territory. The... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Skeena Cellulose Inc. Environmental Effects Monitoring (EEM) Cycle Three Desi...
The purpose of this design document is to summarize and update mill process information and results from previous cycles and other studies, and to provide a rationale for the design of the Cycle Three program. Five elements of the EEM program will be... -
Rail Evacuation Maps
Railway evacuation maps for diesel, methanol, and propane referenced from the North American 2016 Emergency Response Guidebook -
Prince Rupert Marine Risk Assessment
This study provides Prince Rupert Port Authority (PRPA) with an assessment of the risks due to future operations of LNG and oil tankers in the Prince Rupert gateway, to compare these risks with similar existing gateways in North America, and to identify... -
Pacific Northern Gas Looping Project: Project Description
This report summarizes the Pacific Northern Gas Looping Project by describing the project, areas of federal interest, the resource and material requirements, indigenous engagement, public engagement, project setting, and potential project effects. -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Letter from Canadian Environmental Assessment Agency Fisheries for the Aurora...
The Canadian Environmental Assessment Agency (the Agency) is writing to inform Fisheries and Oceans Canada that in performing the duties and functions of the responsible authority for the environmental assessment (EA) of the proposed Aurora LNG Project (the... -
Application for Enbridge Northern Gateway Project Certificate of Public Conve...
This report summarizes the salmon-bearing regions that would be intersected by the Enbridge Northern Gateway Project. It analyzes the potential effects of pipeline spills and development to spawning and rearing grounds and to migration. -
Application Information Requirements and Valued Components Selection Document...
This application provides an overview of the details of Aurora LNG's liquefied natural gas project on Digby Island. It provides relevant history, and explains how the surrounding natural environments could potentially be affected and how Aurora LNG plans to...