Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Stream Inventory - Thautil River Watershed
An aquatic stream inventory was conducted in the Thautil River Watershed in the Morice Forest District during the summer and fall of 1996. This report presents an overview of the key results of the fish and habitat sampling program including fish... -
Reconnaissance Fish and Fish Habitat Inventory of the Middle Skeena River Tri...
This fish and fish habitat inventory provides information regarding fish species presence, distribution, and relative abundance, as well as stream reach biophysical data, for use in interpretation of habitat sensitivity and capability for fish production. -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the construction of a Tailings Storage Facility, including tailings and seepage control dams,... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
Dahlie Creek Salmonid Overwintering and Water Quality Studies: Interim Report
This document contains a detailed fish habitat, riparian, and channel assessment of Dahlie Creek. Low channel complexity, removal of riparian vegetation, culvert obstructions to fish passage, sedimentation, altered flow regime, and channelization were some... -
Conceptual Fish Habitat Offsetting Plan: Proposed Aurora LNG Project
This Conceptual Fish Habitat Offsetting Plan marks the first step along the path to developing a Final Fish Habitat Offsetting Plan in support of an application for a Fisheries Act Authorization. More immediately, this plan is intended to support Aurora... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Un...
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management Unit (IRM). The objectives were to conduct a literature review of inventory... -
2008 Stream Assessment for Select Areas and Road Crossings within Nadina Fore...
This report summarizes the results of the stream assessments, which were completed between July 14 and October 22, 2008. All evaluated drainages are within the Babine Lake (BABL), Babine River (BABR), Bulkley River (BULK), Francois Lake (FRAN), Morice River...