Level I Detailed Field Assessment of Aquatic and Riparian Habitat for Coldwat...
The Watershed Restoration Program of British Columbia is a program whereby watersheds that have been damaged by past logging practices undergo restoration. The program involves a number of steps that commence with an overview study, followed by a detailed... -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from forest development and harvesting activities. Recommendations for further... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Shovel Lake Wildfire Ecosystem Restoration Plan
This collaborative and holistic Ecosystem Restoration Plan for the 2018 Shovel Lake Wildfire attempts to consider all values and address ecological integrity and resilience in the context of climate change and the development history of the region. It... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Lakelse River Watershed - Review of Existing Information
This report reviews existing water, fisheries, and land-use related information for the Lakelse River watershed, considered for Fisheries Sensitive Watershed designation. This review is to determine if significant fish values occur in the watershed, and if... -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual Compe...
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas (KLNG) facility to the Spectra Energy Transmission BC pipeline facilities located... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s distribution of information during the Application Review; report on whether the... -
Khyex-Tyee: Foreshore Habitat Re-construction Works
This report documents the foreshore habitat compensation works constructed by the Ministry of Transportation and Highways as part of the Highway 16 reconstruction project, located near Prince Rupert, B.C. -
Conceptual Fish Habitat Offsetting Plan: Proposed Aurora LNG Project
This Conceptual Fish Habitat Offsetting Plan marks the first step along the path to developing a Final Fish Habitat Offsetting Plan in support of an application for a Fisheries Act Authorization. More immediately, this plan is intended to support Aurora... -
Stream Inventory: Owen Creek Watershed 1998
An aquatic inventory was conducted in the Owen Creek Watershed from late June through mid-August 1998. These studies were a continuation of an aquatic inventory program initiated in 1996 in the Thautil and Owen Operating Areas (Morice TSA 20). The major...