Annual Compendium of Aquatic Rehabilitation Projects for the Watershed Restor...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring rehabilitation of logging-impacted hill slopes, riparian areas, and streams. -
Upper Bulkley Restoration Sites
Link to the Upper Bulkley restoration sites map on the Skeena Maps Portal. The restoration sites represent ongoing and recent (post-2016) restoration sites in the Upper Bulkley Watershed. -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in the Upper Buck C...
This inventory provides information regarding the characteristics, distributions, and relative abundance of fish species, as well as information on biophysical lake and stream data. This information can be used for the interpretation of habitat sensitivity... -
Maxan Watershed Stream Habitat Restoration and Enhancement Level 2 Design Rep...
AGRA Earth & Environmental Limited (AEE) was retained by Dz'ilh K'Az Kwa Development Corporation (DKK) to design stream habitat restoration and enhancement measures in the Maxan watershed. -
Maxan Creek Stream Channel, Bank Stabilization and Aquatic Habitat Rehabilita...
This document is a proposal for a study focusing on aquatic habitat rehabilitation in the Maxan Creek stream channel. The need for this project is presented, as well as previous assessments and prescriptions. The proposal presents the required equipment, a... -
As-built Report of Fish Passage Improvement Projects within the Wet'suwet'en ...
This report describes the fish passage restoration projects completed at three high-priority sites on the upper Bulkley River within Wet'suwet'en First Nation territory in 2017. Restoration works involved the construction of rock riffles to backwater... -
As-built Report of Aquatic Restoration and On-farm Cattle Management Improvem...
This report describes the aquatic habitat restoration construction completed at the lower Craker Road site and repairs completed to two instream structures within the upper Bulkley River originally constructed in 2016. The objectives of the project were to... -
As-built Report of Aquatic Restoration and On-farm Cattle Management Improvem...
This report describes the as-built aquatic habitat restoration projects undertaken at four high-priority sites along the upper Bulkley River within Wet'suwet'en First Nation territory. The objectives of the project were to provide stable complex habitat for...