9 datasets found

Tags: prince rupert 2010s lng

Filter Results
  • Vopak Pacific Canada Project Description

    The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where...
  • The Environmental Implications of Sediment Transport in the Waters of Prince ...

    The Environmental Implications of Sediment Transport in the Waters of Prince Rupert, British Columbia, Canada: A Comparison Between Kinematic and Dynamic Approaches. A Sediment Trend Analysis (STA) was performed on 2474 grain-size distributions taken from...
  • Surface Freshwater Quality Technical Data Report: Proposed Aurora LNG Project

    This technical data report presents the results of the surface freshwater acidification and eutrophication assessment including a description of field surveys, methods, and baseline data describing existing conditions.
  • Skeena Estuary and Industrial Development

    A review of the Skeena estuary and the proposed industrial developments in the area.
  • Skeena Cumulative Effects Assessment

    This Skeena Cumulative Effects Assessment (SCEA) documents the analysis of the cumulative effects of individual and multiple physical, biological and chemical stressors associated with human activities on three key species: eulachon, Chinook salmon and...
  • Project Description Prince Rupert LNG

    Prince Rupert LNG Limited (PRLNG) proposes to develop a Liquefied Natural Gas (LNG) facility on Ridley Island at the Port of Prince Rupert British Columbia (BC). The name of the project is Prince Rupert LNG (the Project). This document describes the project.
  • Prince Rupert Marine Risk Assessment

    This study provides Prince Rupert Port Authority (PRPA) with an assessment of the risks due to future operations of LNG and oil tankers in the Prince Rupert gateway, to compare these risks with similar existing gateways in North America, and to identify...
  • Marine Sediment and Water Quality Technical Data Report: Proposed Aurora LNG ...

    To facilitate safe manoeuvring and berthing of vessels, capital dredging of marine sediment and rock will be required at two berth areas, located south of Frederick Point, and at the Materials Off-Loading Facility. The data presented herein will be used to...
  • Conceptual Fish Habitat Offsetting Plan: Proposed Aurora LNG Project

    This Conceptual Fish Habitat Offsetting Plan marks the first step along the path to developing a Final Fish Habitat Offsetting Plan in support of an application for a Fisheries Act Authorization. More immediately, this plan is intended to support Aurora...
You can also access this registry using the API (see API Docs).