Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development...
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development Prince Rupert Bulk Loading Facility - Phase 1 and 2 Phase 1: Bulk Marine Terminal Sites (Engineering Aspects) Phase 2: Environmental Assessment of Alternatives Northcoast... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Skeena Cellulose Inc. Environmental Effects Monitoring (EEM) Cycle Three Desi...
The purpose of this design document is to summarize and update mill process information and results from previous cycles and other studies, and to provide a rationale for the design of the Cycle Three program. Five elements of the EEM program will be... -
Prince Rupert Area Coastal Fish Habitat Bibliography
A bibliography of existing coastal information describing habitat and biota. -
Khyex-Tyee: Foreshore Habitat Re-construction Works
This report documents the foreshore habitat compensation works constructed by the Ministry of Transportation and Highways as part of the Highway 16 reconstruction project, located near Prince Rupert, B.C. -
Grassy Point LNG-Dome Environmental Assessments
Environmental assessments, risk analysis, and proposals for the development of a LNG terminal facilities at Grassy Point. -
Environmental Review of Proposed Port Development in Prince Rupert, B.C.
This report suggests possible port locations in the Prince Rupert area and has formed the basis for subsequent environmental studies. -
Conceptual Fish Habitat Offsetting Plan: Proposed Aurora LNG Project
This Conceptual Fish Habitat Offsetting Plan marks the first step along the path to developing a Final Fish Habitat Offsetting Plan in support of an application for a Fisheries Act Authorization. More immediately, this plan is intended to support Aurora...