Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and the lower Telkwa... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Fish Monitoring Studies in Buck, Foxy and Crow Creeks and Goosly Lake
These reports present the results of the 2012 and 2017 fish monitoring programs conducted in the vicinity of Equity Mine near Houston BC. -
Aurora LNG Freshwater Fish and Fish Habitat Final Report 2014-2015
The objective of the Freshwater Fish and Fish Habitat Program was to conduct field surveys of streams within and adjacent to the Project area (i.e., location of LNG plant infrastructure and ancillary facilities on Digby Island). This report presents the... -
Assessment of Benthic Invertebrate and Juvenile Fish Populations in Foxy and ...
Field studies assessing fish and benthic invertebrate populations in Foxy Creek, a small stream located in north central British Columbia near Houston, were undertaken in late August and September 1984. As well, benthic invertebrate populations were... -
A Review of the Effects Assessment for the Morrison Copper/Gold Project
An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application for an Environmental Assessment Certificate. During the course of the Project... -
The Potential Effects of Cadmium and Other Mixed Metal Mining Effluents on Fi...
This review is a qualitative assessment of existing data and a review of relevant primary literature. The objective of this review is to assess the potential effects of elements released from the Morrison Copper/Gold Project on fish assemblages in Morrison...