-
Toboggan Creek Coho Smolt Enumerations
The primary focus of the "Toboggan Creek Smolt Project" is to estimate the number of wild coho (0. kisutch) smolts leaving Toboggan Creek. Initiated in the spring of 1995, the study aimed to estimate wild coho populations of Toboggan Creek by comparison... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and the lower Telkwa... -
Stream Inventory: Fenton Creek and Adjacent Tributaries 1997
This survey provides an assessment of fish presence/absence in Fenton Creek and its adjacent tributaries. It identifies stream gradients and reasons for obstructed fish passage, and identifies key habitat features that require special management attention.... -
Strategic Stock Enhancement Program Report Upper Skeena: 1998/1999/2000
The Upper Bulkley River coho are an extreme conservation concern. The objective for Upper Bulkley coho was to release up to 80K fry to rearing areas in the watershed that are currently under-utilized. Coho released as fry would be subjected to natural... -
Results of the Kloiya River Resistivity Counter
The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began investigating the potential of using the Kloiya as an index stream for monitoring... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Tributaries in the ...
The objective of this project was to conduct a Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in several watersheds within the Bulkley River (BULK) watershed group. These inventories have a multi-phased approach with six phases required to... -
Pacific Salmon Commission Northern Boundary Technical Committee Report: Statu...
This document presents an assessment of the status of coho salmon (Onchorhynchus kisutch) in the Canadian northern boundary areas with emphasis on the Skeena River. The content of this assessment has largely been drawn from published assessments. There are... -
Pacific Fisheries Resource Conservation Council: Freshwater Habitat
This report discusses the attempts that British Columbians are making in the effort to protect and manage salmon habitat. They also describe the relevant legislation, policy, and regulation, science and technology, as well as government and "stakeholder"... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the construction of a Tailings Storage Facility, including tailings and seepage control dams,... -
Mission Creek Adult Coho Enumeration and Transport Program: 1998 Program Report
A broomstick fence was constructed and installed in early September 1998. Coho capture and counting occurred from early September to November 1, 1998. The purpose of the counting fence system was to enumerate coho adults returning to Mission Creek and to... -
Kispiox River Steelhead Trout: the 1975 Sport Fishery and Life History Charac...
During the months of September, October, and November of 1975, a creel survey and catch sampling program was conducted on the Kispiox River to gather information on the steelhead fishery including angler origin, effort, methods used, and success. Scale... -
Juvenile Coho Salmon and Steelhead Assessment of Lower Toboggan Creek, Septem...
Juvenile sampling and habitat assessment was conducted in the lower three kilometers of Toboggan Creek from September to November, 1998. The lower two kilometers of the stream is of lower habitat quality (higher gradient, greater velocity, little cover)... -
Habitat Improvement and Outplanting Possibilities - Upper Bulkley/ Morice Sys...
The NCD Habitat Unit, along with coho biologists from the Science Branch, conducted a juvenile coho sampling program on the Upper Bulkley/Morice River systems during the month of August from 1987 to 1990. This study furthers the understanding of coho... -
Effects of Beaver on Juvenile Coho Salmon Habitat in Kispiox River Tributaries
The purpose of this study was to collect data to determine how beaver dams might affect coho populations in tributaries of the Kispiox River, and to provide a review of the literature on the effects of beaver activity on salmonid populations. -
Distribution, Timing, and Numbers of Steelhead Returning to the Skeena Waters...
This report summarizes the data collected during the July to November 1995 period and describes the fate and timing information of steelhead movements to the end of November 1995. Fishwheels operated by the Kitselas Band Office were used to catch and apply... -
Canada's Policy for Conservation of Wild Pacific Salmon: Stream, Lake, and Es...
This report documents the methodology used by the Department of Fisheries and Oceans (DFO) to identify potential Strategy 2 habitat indicators, metrics, and benchmarks (as well as possible sampling protocols). The proposed list of indicators presented in... -
Biological Assessment of Skeena River Coho Salmon
This paper provides data on juvenile densities throughout the Skeena watershed in the year following record low escapements and documents the responses in escapement to the conservation measures taken in 1998. For the Babine Lake coho aggregate, advice is... -
Aurora LNG Freshwater Fish and Fish Habitat Final Report 2014-2015
The objective of the Freshwater Fish and Fish Habitat Program was to conduct field surveys of streams within and adjacent to the Project area (i.e., location of LNG plant infrastructure and ancillary facilities on Digby Island). This report presents the... -
Assessment of Benthic Invertebrate and Juvenile Fish Populations in Foxy and ...
Field studies assessing fish and benthic invertebrate populations in Foxy Creek, a small stream located in north central British Columbia near Houston, were undertaken in late August and September 1984. As well, benthic invertebrate populations were...