16 datasets found

Tags: pollution water chemistry

Filter Results
  • Water Quality and Biological Studies in the Marine Environment Near the Skeen...

    Studies in Porpoise Channel, Porpoise Harbour and Wainwright Basin during 1986 encompassed physical, chemical, and biological assessments of the local environment. These parameters ultimately being related to the discharge of kraft pulpmill effluent into...
  • Northwest Cumulative Effects Case Study

    The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency...
  • The Flooded Tailings Impoundment at the Equity Silver Mine

    The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This...
  • Site-Specific Water Quality Guidelines for Skeena River at Usk for the Purpos...

    Site-specific water quality guidelines for the Skeena River at Usk for the purpose of national reporting (May 2005). This document is one in a series that presents ambient site-specific water quality guidelines (SSGs) for British Columbia and the Yukon....
  • Round Lake 2002-2005

    A report detailing the water quality of Round Lake located in Smithers, BC between the years 2002-2005. Data was gathered as part of The BC Lake Stewardship and Monitoring program to provide communities with monitoring results and educational material on...
  • Nutrients and Algae in the Upper Bulkley River watershed 1997-2000

    This study focused on the diffuse sources of nutrients and the trophic status of the Upper Bulkley River. Monthly water chemistry monitoring of the Upper Bulkley and tributaries was conducted between November 1997 and March 2000, and the end of growing...
  • Morrison Copper/Gold Project 3rd Party Review Response Report

    This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water...
  • Marine Sediment and Water Quality Technical Data Report: Proposed Aurora LNG ...

    To facilitate safe manoeuvring and berthing of vessels, capital dredging of marine sediment and rock will be required at two berth areas, located south of Frederick Point, and at the Materials Off-Loading Facility. The data presented herein will be used to...
  • Kathlyn, Seymour, Round, and Tyhee Lakes: Water Quality Assessment and Object...

    This study quantifies the inputs of phosphorus from various sources and determines the extent to which additional phosphorus could be tolerated by each lake without a serious decrease in water quality. Based on this information, appropriate land uses and...
  • Consequences of Unregulated Release of Raw Acid Mine Drainage into the Bulkle...

    Approximately 800 000 m3 of acid mine drainage (AMD) is generated per year at the Equity Silver Mine southeast of Houston. This AMD would have devastating effects on the Bulkley River if it was allowed to flow untreated from the property for a prolonged...
  • Conceptual Fish Habitat Offsetting Plan: Proposed Aurora LNG Project

    This Conceptual Fish Habitat Offsetting Plan marks the first step along the path to developing a Final Fish Habitat Offsetting Plan in support of an application for a Fisheries Act Authorization. More immediately, this plan is intended to support Aurora...
  • BC Surface Water Monitoring Sites

    The Surface Water Monitoring Sites web application allows users to browse a map interface to find freshwater monitoring locations throughout BC. Clicking on a station provides the name and description of the water quality monitoring station as well as...
  • A Reconnaissance Survey of Toboggan Lake

    This survey data includes information regarding the location, physical data, terrain features, water chemistry and temperature, obstructions and pollutions, miscellaneous, netting results, stomach analysis, resort and campsite, habitation, access, oxygen,...
  • Telkwa Coal Project Aquatic Resource Assessment (1985)

    This report is the result of studies undertaken in 1984 that evaluated aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and...
  • National Atmospheric Deposition Program

    Weblink to the National Atmospheric Deposition Program website. This website holds data and information on acid rain, atmospheric deposition, and precipitation chemistry.
  • Environmental Impact Information of the Proposed Equity Mining Capital Ltd. D...

    During 1974, Environment Canada undertook an additional study of the watershed adjacent to Equity Mining Capital Ltd.'s proposed development near Goosly Lake to supplement water quality baselines established in 1973. Chemistry analysis and 96 hour LC50...
You can also access this registry using the API (see API Docs).