Review of Cattle-Community Watershed Conflicts in the Skeena Region
This report provides the B.C. Ministry of Environment, Lands & Parks (BCE) with a review of cattle farming in the Skeena Region, and a recommendation for monitoring the impact of cattle and other livestock operations on community watersheds, including... -
Water Quality in British Columbia Objectives Attainment
The setting of water quality objectives in priority basins in British Columbia began in 1982. By the end of 2002, the Ministry of Water, Land, and Air Protection had set water quality objectives in 51 areas or basins and updated them throughout the... -
Water Quality Assessment and Objectives for Toboggan Creek and Tributaries: T...
The purpose of this report is to assess the water quality and aquatic ecosystem data gathered to date and to recommend water quality objectives specific to the Toboggan Creek watershed. Designated water uses, to be protected by water quality objectives, are... -
Water Management at Equity Silver Mines Ltd.
Predominantly all wastes, both tailing and blasted rock, contain pyrite and are classified acid generating. Acid generation occurs within waste rock fills around the property however not within tailing thus far due to sub- aqueous disposal of the product.... -
Tyhee Lake Monitoring Results
A weblink to the Tyhee Lake sampling history and monitoring results on the BC Lake Monitoring Network. -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Skeena River Estuary Assessment Project
This project assessed key pressures on salmon habitat in the Skeena River estuary. The authors used benchmarks to assess the status of salmon habitat indicators and identified critical knowledge gaps and future monitoring needs. -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Site-Specific Water Quality Guidelines for Skeena River at Usk for the Purpos...
Site-specific water quality guidelines for the Skeena River at Usk for the purpose of national reporting (May 2005). This document is one in a series that presents ambient site-specific water quality guidelines (SSGs) for British Columbia and the Yukon.... -
Site Specific Risk Assessments of Two Former Copper Concentrate Shed Sites Ne...
In summary, the risk assessments identified COCs in soil that may have potential to cause adverse effects, especially to soil invertebrates and plants, although this is principally a theoretical risk owing to important habitat limitations in the most... -
Sampling of Metals and Aquatic Life in the Bulkley River Adjacent to the Form...
This study was carried out to monitor the effects, if any, of the former Topley Concentrate Shed Site ("Topley Site") on concentrations of dissolved and total metals and other parameters and on aquatic life in the Bulkley River. The study included three... -
Reconnaissance Survey of Buckley Lake
This document contains information about Buckley lake habitat quality. Information recorded includes physical, chemical, temperature, oxygen, obstruction and pollutions, stocking, access, and habitation data. Maps and images are also included. -
Reconnaissance Inventory of Cerber Lake (Alias)
A reconnaissance survey of Cerber Lake within the Bulkley River watershed. The purpose of this survey was to provide essential fish and fish habitat information required for resource planning or making management decisions for Cerber Lake. -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,... -
Nutrients and Algae in the Upper Bulkley River watershed 1997-2000
This study focused on the diffuse sources of nutrients and the trophic status of the Upper Bulkley River. Monthly water chemistry monitoring of the Upper Bulkley and tributaries was conducted between November 1997 and March 2000, and the end of growing... -
Morrison Copper/Gold Project 3rd Party Review Response Report