Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Westcoast Energy Inc Fireweed Offload Pipeline Project: Fisheries Habitat Ass...
This pre-impact habitat assessment was conducted on June 30, 1994 to identify and evaluate fish habitat along the proposed route associated with this project. -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where... -
Skeena Delta Sedimentation, British Columbia
Sediment samples were collected from the sea floor off the delta front, from the lower reaches of the Skeena River channels, and from small beaches and basins in the vicinity of Ridley Island. This paper describes the results of the grain analysis and... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s distribution of information during the Application Review; report on whether the... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
Conceptual Fish Habitat Offsetting Plan: Proposed Aurora LNG Project
This Conceptual Fish Habitat Offsetting Plan marks the first step along the path to developing a Final Fish Habitat Offsetting Plan in support of an application for a Fisheries Act Authorization. More immediately, this plan is intended to support Aurora... -
Application Information Requirements and Valued Components Selection Document...
This application provides an overview of the details of Aurora LNG's liquefied natural gas project on Digby Island. It provides relevant history, and explains how the surrounding natural environments could potentially be affected and how Aurora LNG plans to... -
Excel Energy Inc: Birch Oil Sales Pipeline Pre-Impact Fisheries Habitat Asses...
Excel Energy Inc. planned to construct an oil pipeline in the area of the Birch oil field in northeastern British Columbia. The project involved the construction of approximately 36 kilometres of pipeline for the purpose of transporting crude oil from...