Review of Cattle-Community Watershed Conflicts in the Skeena Region
This report provides the B.C. Ministry of Environment, Lands & Parks (BCE) with a review of cattle farming in the Skeena Region, and a recommendation for monitoring the impact of cattle and other livestock operations on community watersheds, including... -
Water Quality in British Columbia Objectives Attainment
The setting of water quality objectives in priority basins in British Columbia began in 1982. By the end of 2002, the Ministry of Water, Land, and Air Protection had set water quality objectives in 51 areas or basins and updated them throughout the... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Technical and Management Proposal: Impact of Coal Dust on Marine Environment ...
The report contains a concise summary report outlining the findings of this study on the potential impact of coal and coal contaminated sediments on marine life. -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Sampling of Metals and Aquatic Life in the Bulkley River Adjacent to the Form...
This study was carried out to monitor the effects, if any, of the former Topley Concentrate Shed Site ("Topley Site") on concentrations of dissolved and total metals and other parameters and on aquatic life in the Bulkley River. The study included three... -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,... -
Reconnaissance Inventory of Damsumlo Lake
The Damsumlo Lake fish community was sampled with two standard experimental multi-mesh gillnets (one floating and one sinking) and five Gee-type minnow traps baited with salmon roe. Inlets and the outlet stream were sampled for fish presence by... -
Reconnaissance Inventory of Cerber Lake (Alias)
A reconnaissance survey of Cerber Lake within the Bulkley River watershed. The purpose of this survey was to provide essential fish and fish habitat information required for resource planning or making management decisions for Cerber Lake. -
Nutrients and Algae in the Upper Bulkley River watershed 1997-2000
This study focused on the diffuse sources of nutrients and the trophic status of the Upper Bulkley River. Monthly water chemistry monitoring of the Upper Bulkley and tributaries was conducted between November 1997 and March 2000, and the end of growing... -
Ned'u'ten Fisheries Commission 1996/97
The 1996 harvest was unprecedented in a number of ways. It was the first time that all three nations in the Skeena watershed have worked together on such a huge scale. It was the largest harvest undertaken on Babine Lake in modern times in terms of the... -
Fish Population Monitoring in Foxy and Buck Creeks
Sampling at fish index sites was conducted at five locations in Foxy and Buck creeks for Equity Silver Mines Ltd. from September 1988 to 1991. -
A Reconnaissance Inventory of Clota Lake
The field survey was conducted on September 23 and 24, 1996 by G. Scarborough and J. Calvert. This lake is located east of Nilkitkwa Lake, approximately 6.6 km north of Fort Babine, and has not previously been surveyed. The purpose of this survey was to... -
Telkwa Coal Project Appendix 2: ARD Potential and Management 1994
This report follows previous studies in 1985 on the coal deposits near Goathorn Creek, and in 1990 and 1991 on the coal deposits north of the Telkwa River. This report discusses all relevant evidence on the potential for acid generation, provides a...