Impacts of LNG Development to Salmon Habitat on Lelu Island and Flora Bank
This report outlines the unaddressed issues that remain after the mitigation proposal presented by Petronas for a suspension bridge over Flora Bank. -
Analysis of Skeena River Tributaries Downstream from the Proposed Enbridge Pi...
This study's objective was to develop and map metrics that delineate the areas of the Skeena River and its tributaries most vulnerable to potential pipeline spills associated with the proposed Enbridge corridor to Kitimat, BC. -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en response in respect of the proposed Coastal GasLink pipeline project within... -
Wet'suwet'en Submission to the Canadian Environmental Assessment Agency - Pac...
This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific NorthWest LNG project near LeLu Island. -
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect of the proposed Northern Gateway project within Wet'suwet'en territory. The... -
Westcoast Connector Gas Transmission Project: Conceptual Freshwater Fish Habi...
This freshwater CFHOP outlines the strategy and framework for development of the Final Fish Habitat Offsetting Plan (FHOP). A marine CFHOP companion document has also been prepared. The FHOP will be developed via discussions with regulatory agencies and... -
WWF - Watershed Report: Skeena Sub-Watershed 2017
WWF has completed the first Canada-wide assessment of the country’s watersheds, focusing on four indicators of river health and seven key threats. The resources below link to the WWF Watershed Reports at a national level and provide access to the detailed... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where... -
The Environmental Implications of Sediment Transport in the Waters of Prince ...
The Environmental Implications of Sediment Transport in the Waters of Prince Rupert, British Columbia, Canada: A Comparison Between Kinematic and Dynamic Approaches. A Sediment Trend Analysis (STA) was performed on 2474 grain-size distributions taken from... -
Tenas Project 2017-2018 Baseline Report Final
This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project. -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Surface Freshwater Quality Technical Data Report: Proposed Aurora LNG Project
This technical data report presents the results of the surface freshwater acidification and eutrophication assessment including a description of field surveys, methods, and baseline data describing existing conditions. -
Skeena Estuary and Industrial Development
A review of the Skeena estuary and the proposed industrial developments in the area. -
Skeena Cumulative Effects Assessment
This Skeena Cumulative Effects Assessment (SCEA) documents the analysis of the cumulative effects of individual and multiple physical, biological and chemical stressors associated with human activities on three key species: eulachon, Chinook salmon and... -
Salmon Science as Related to Proposed Development in the Skeena River Estuary
A collaborative research team of academic and First Nation scientists has been studying the Skeena River estuary ecosystem and its juvenile salmon. After 4 years, 100 boat days, 500 net hauls, and nearly 200,000 fish sampled, this program represents the... -
Project Description Prince Rupert LNG
Prince Rupert LNG Limited (PRLNG) proposes to develop a Liquefied Natural Gas (LNG) facility on Ridley Island at the Port of Prince Rupert British Columbia (BC). The name of the project is Prince Rupert LNG (the Project). This document describes the project. -
Prince Rupert Marine Risk Assessment
This study provides Prince Rupert Port Authority (PRPA) with an assessment of the risks due to future operations of LNG and oil tankers in the Prince Rupert gateway, to compare these risks with similar existing gateways in North America, and to identify... -
Pacific Northwest LNG: Project Description
Pacific NorthWest LNG Limited Partnership (PNW LNG) is proposing to construct and operate a liquefied natural gas (LNG) export facility within the District of Port Edward, British Columbia (BC). This report outlines the procedures and plans for the... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Nisga'a Lands Freshwater Fish and Fish Habitat Technical Data Report for the ...
This report summarizes field data collected in 2014 for fish and fish habitat along the proposed application corridors within Nisga’a Lands. Fish and fish habitat information and field results for the remainder of the proposed project were collected in 2012...