2015 Assessment Report on the Topley Richfield Property
Exploration during 2015 was designed to located and sample all historic showings and to map the old trenches, shafts and declines within the property. With an estimated 20,000 tons of dump material situated on the Main Zone and another 47 tons on the West... -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use Activit...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and hatchery fish, primarily coho, pink, steelhead and Dolly Varden, with smaller... -
Upper Bulkley and Morice Water and Salmon Sustainability Views: Inventory of ...
In the Upper Bulkley and Morice basins of the Skeena watershed, climate change and human induced stresses are contributing to the degradation of aquatic resources, including salmon populations. It is apparent that collaborative efforts to better manage and... -
Upper Bulkley River Steelhead Population Monitoring
The upper Bulkley River system, near Houston, was first assessed by the Fish Habitat Improvement Section in 1981. The initial assessment identified probably areas of importance for steelhead recruitment and juvenile rearing. In 1982 an index sampling... -
Upper Bulkley Fish and Aquatic Review: Summary of Data, Methodology, Threshol...
The Upper Bulkley Fish and Aquatic Review project produced a set of analyses focused on select pressure and quantity indicators as determined by the Wild Salmon Policy Strategy 2. Pressure Indicators included are Road Density, Riparian Disturbance, and... -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Tenas Project Public Consultation Plan
The Tenas Project Public Consultation Plan aims to capture past and future engagement activities between Telkwa Coal Limited (TCL) and the local community and stakeholders, identifying the issues the project may cause and responding to comments and... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological Investigatio...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed Telkwa Coal Project near Telkwa, B.C. The work program for this investigation was... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and the lower Telkwa... -
Site Specific Risk Assessments of Two Former Copper Concentrate Shed Sites Ne...
In summary, the risk assessments identified COCs in soil that may have potential to cause adverse effects, especially to soil invertebrates and plants, although this is principally a theoretical risk owing to important habitat limitations in the most... -
Review of 2010 financial security at Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Future liability is important at the site due to the environmental risk and high cost of treating acid rock... -
Reconnaissance Geochemical Soil Survey and Reconnaissance Geological Survey R...
The purpose of the reconnaissance geological survey was to determine whether the board band of favourable volcanic host rocks seen on the northwest section of the Topley property continue into the Spring Group, and how these rocks relate to the... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in the Upper Buck C...
This inventory provides information regarding the characteristics, distributions, and relative abundance of fish species, as well as information on biophysical lake and stream data. This information can be used for the interpretation of habitat sensitivity... -
Ongoing Legacy of Metal Mines on Babine Lake
An assessment of discharge regulation, aquatic monitoring, and aquatic impacts related to Bell and Granisle Mines. -
Morice Watershed-Based Fish Sustainability Plan: A Plan to Conserve and Prote...
The purpose of the Morice Watershed-based Fish Sustainability Plan is to sustain robust fish populations and fully functioning aquatic ecosystems in the Morice River watershed. The goals of the plan are to: • Maintain and protect existing fish habitat; •... -
Morice Land and Resource Management Plan
The Morice LRMP provides policy direction on the management of land and resources in the Morice LRMP area, and provides direction for the establishment of landscape level legal objectives. There are four main sections to the plan: General Management... -
Mid-Bulkley Overview Fish and Fish Habitat Assessment for Watershed Restoration
An overview fish and fish habitat assessment in the sub-basins of the Mid-Bulkley Watershed that: determines what fish species are at risk to the impacts of poor land-use practices in the watershed; identifies areas of concern that need to be examined in...