Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development...
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development Prince Rupert Bulk Loading Facility - Phase 1 and 2 Phase 1: Bulk Marine Terminal Sites (Engineering Aspects) Phase 2: Environmental Assessment of Alternatives Northcoast... -
Zymoetz and Clore River Steelhead Trout: A Report on the 1978 and 1979 Sport ...
This paper presents data collected during a creel census conducted in the years 1978 and 1979, and includes information on angler harvest and success, and life histories of Zymoetz-Clore steelhead. -
Superport Development Preliminary Environmental Effect Assessment
A preliminary environmental effects assessment relating to the potential port sites identified in the Port Development Study by Wright Engineers Limited for the National Harbours Board. -
Skeena Delta Sedimentation, British Columbia
Sediment samples were collected from the sea floor off the delta front, from the lower reaches of the Skeena River channels, and from small beaches and basins in the vicinity of Ridley Island. This paper describes the results of the grain analysis and... -
Mid-Bulkley Overview Fish and Fish Habitat Assessment for Watershed Restoration
An overview fish and fish habitat assessment in the sub-basins of the Mid-Bulkley Watershed that: determines what fish species are at risk to the impacts of poor land-use practices in the watershed; identifies areas of concern that need to be examined in... -
Manuscript Report Series No. 1345: Intertidal Biota and Preliminary Observati...
This report provides visual observations and details of sampling locations for the cruises. The detailed information resulting from the work will be presented in future publications and theses. -
Environmental Review of Proposed Port Development in Prince Rupert, B.C.
This report suggests possible port locations in the Prince Rupert area and has formed the basis for subsequent environmental studies. -
A Preliminary Evaluation of the Environmental Impact of Mining, Community Dev...
An ecological study to assess the impact of environmental changes on the Babine sockeye production is currently being conducted under the auspices of the Babine Watershed Change Program. Specifically the Environmental Quality Unit of the Northern Operations... -
A Cursory Investigation of the Productivity of the Skeena River Estuary
An investigation of the productivity of the Skeena River estuary subsequent to receipt of a port development proposal near Prince Rupert. -
Babine Watershed Change Program: Annual Report for 1972
A summary of the studies regarding the Babine Watershed Change Program, with topics ranging from discussion of industrial activities to fisheries and disease outbreaks.