-
Upper Bulkley and Morice Water and Salmon Sustainability Views: Inventory of ...
In the Upper Bulkley and Morice basins of the Skeena watershed, climate change and human induced stresses are contributing to the degradation of aquatic resources, including salmon populations. It is apparent that collaborative efforts to better manage and... -
Upper Bulkley River Steelhead Population Monitoring
The upper Bulkley River system, near Houston, was first assessed by the Fish Habitat Improvement Section in 1981. The initial assessment identified probably areas of importance for steelhead recruitment and juvenile rearing. In 1982 an index sampling... -
Upper Bulkley Fish and Aquatic Review: Summary of Data, Methodology, Threshol...
The Upper Bulkley Fish and Aquatic Review project produced a set of analyses focused on select pressure and quantity indicators as determined by the Wild Salmon Policy Strategy 2. Pressure Indicators included are Road Density, Riparian Disturbance, and... -
Upper Bulkley Fish and Aquatic Review Summary of Data, Methodology, Threshold...
The Upper Bulkley Fish and Aquatic Review project produced a set of analyses focused on select pressure and quantity indicators as determined by the Wild Salmon Policy Strategy 2. Pressure Indicators included are Road Density, Riparian Disturbance, and... -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This... -
The Environmental Implications of Sediment Transport in the Waters of Prince ...
The Environmental Implications of Sediment Transport in the Waters of Prince Rupert, British Columbia, Canada: A Comparison Between Kinematic and Dynamic Approaches. A Sediment Trend Analysis (STA) was performed on 2474 grain-size distributions taken from... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Tenas Project Public Consultation Plan
The Tenas Project Public Consultation Plan aims to capture past and future engagement activities between Telkwa Coal Limited (TCL) and the local community and stakeholders, identifying the issues the project may cause and responding to comments and... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological Investigatio...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed Telkwa Coal Project near Telkwa, B.C. The work program for this investigation was... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and the lower Telkwa... -
Technical and Management Proposal: Impact of Coal Dust on Marine Environment ...
The report contains a concise summary report outlining the findings of this study on the potential impact of coal and coal contaminated sediments on marine life. -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
TANTALIS - Surveyed Right-of-way Parcels
This dataset contains the spatial representation (polygon) of all parcels of land surveyed for statutory access or Right-of-Way purposes, with active surveys, that are or have been within the purview of the B.C. Crown Land Management program. The view was... -
TANTALIS - Crown Land Rights-of-way
This dataset contains the spatial representation (polygon) of active and applied for Statutory Rights-of-way. Statutory rights-of-way are registerable in a Land Titles office, and are normally issued to authorize linear uses of Crown Land for... -
Suspended Sediment Telkwa River Watershed
In general, the study aimed to determine the timing of suspended sediment transport within the Telkwa watershed and isolate the sediment sources. This report presents sediment data collected between April and October 1990, preliminary conclusions, and... -
Surface Freshwater Quality Technical Data Report: Proposed Aurora LNG Project
This technical data report presents the results of the surface freshwater acidification and eutrophication assessment including a description of field surveys, methods, and baseline data describing existing conditions. -
Superport Development Preliminary Environmental Effect Assessment
A preliminary environmental effects assessment relating to the potential port sites identified in the Port Development Study by Wright Engineers Limited for the National Harbours Board. -
Summary of Construction Monitoring at PNG's Maxan Creek Crossing
This is a short report explaining the repair process of an exposed pipeline.