-
Superport Development Preliminary Environmental Effect Assessment
A preliminary environmental effects assessment relating to the potential port sites identified in the Port Development Study by Wright Engineers Limited for the National Harbours Board. -
Skeena Estuary and Industrial Development
A review of the Skeena estuary and the proposed industrial developments in the area. -
Skeena Delta Sedimentation, British Columbia
Sediment samples were collected from the sea floor off the delta front, from the lower reaches of the Skeena River channels, and from small beaches and basins in the vicinity of Ridley Island. This paper describes the results of the grain analysis and... -
Resource Development Patterns of the British Columbia Salmon Canning Industry...
This thesis analyzed the long term history of the salmon canning industry along the B.C. coast between 1870 and 1970 to understand the spatial pattern of the processing plants and some of the factors that controlled the pattern. -
Prince Rupert Marine Risk Assessment
This study provides Prince Rupert Port Authority (PRPA) with an assessment of the risks due to future operations of LNG and oil tankers in the Prince Rupert gateway, to compare these risks with similar existing gateways in North America, and to identify... -
Grassy Point LNG-Dome Environmental Assessments
Environmental assessments, risk analysis, and proposals for the development of a LNG terminal facilities at Grassy Point. -
Fairview Terminal Phase II Expansion Project Comprehensive Study Report
The Prince Rupert Port Authority (PRPA) and Canadian National Railway Company (CN) are proposing the construction and operation of a wharf extension and expanded container and intermodal facilities at the existing Fairview Terminal and the construction and... -
Draft Environmental Effects Evaluation/Application for an Environmental Asses...
Vopac Pacific's overview of the environmental effects of the construction and opertation of the Vopac Pacific Canada Project, which will store Liquified Petroleum Gas, Clean Petroleum Products, and methanol. -
Conceptual Marine Fish Habitat Offsetting Plan: Westcoast Connector Gas Trans...
This marine CFHOP outlines the strategy and framework for development of the Final Fish Habitat Offsetting Plan (FHOP) for the Westcoast Connector Gas Transmission Project. A freshwater CFHOP companion document has also been prepared. The FHOP will be...