Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Conserving Lakelse Fish and their Habitat
Lakelse Watershed backgrounder - This backgrounder has been updated for the use of the Lakelse Lake Sockeye Recovery Plan (LLSRP) planning table. It briefly presents at a watershed scale a biophysical profile, a description of the fisheries resource, and... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Review of the Hydrology, Geomorphology, Ecology & Management of the Skeena Ri...
Review of the hydrology, geomorphology, ecology and management of the Skeena River floodplain. This review of the natural and human history of the floodplain of the lower Skeena River was initiated to provide background information to support future... -
Project Description Prince Rupert LNG
Prince Rupert LNG Limited (PRLNG) proposes to develop a Liquefied Natural Gas (LNG) facility on Ridley Island at the Port of Prince Rupert British Columbia (BC). The name of the project is Prince Rupert LNG (the Project). This document describes the project. -
Prince Rupert Area Coastal Fish Habitat Bibliography
A bibliography of existing coastal information describing habitat and biota. -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water... -
Morice-Nanika Sockeye Recovery Plan
The Morice-Nanika Sockeye Recovery Plan process provides a framework for aboriginal, government, industry, and public groups to work together towards stock recovery. -
Morice Watershed-Based Fish Sustainability Plan: A Plan to Conserve and Prote...
The purpose of the Morice Watershed-based Fish Sustainability Plan is to sustain robust fish populations and fully functioning aquatic ecosystems in the Morice River watershed. The goals of the plan are to: • Maintain and protect existing fish habitat; •... -
Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and assessment system for the recently established Morice Water Management Area (MWMA). -
Lakelse Lake Draft Management Plan
The lake management planning process devises methods “to preserve and protect the quality and health of the Lakelse watershed”. This management plan marks the end of the first iteration of the process, and is intended to provide long- term direction to the... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s distribution of information during the Application Review; report on whether the... -
Hydrolic and Geomorphic Considerations for Silvicultural Investments on the L...
Hydrologic and geomorphic considerations for silvicultural investments on the lower Skeena River floodplain. This report evaluates four inter-related components essential for silvicultural planning on the lower Skeena River floodplain: biophysical... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
A Review of the Effects Assessment for the Morrison Copper/Gold Project
An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application for an Environmental Assessment Certificate. During the course of the Project...