6 datasets found

Tags: grizzly bear monitoring steelhead

Filter Results
  • Northwest Cumulative Effects Case Study

    The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency...
  • BWMT Project Reports

    This dataset contains eighteen reports initiated by the Babine Watershed Monitoring Trust between 2003 and 2013.
  • The Babine River Watershed: An Annotated Bibliography of Inventory, Monitorin...

    This bibliography was completed to provide an information base to the Babine Watershed Monitoring Group. This group is being established to coordinate monitoring of resource management plans and activities in the Babine River watershed, in North Central BC.
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
  • Tenas Project 2017-2018 Baseline Report Final

    This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project.
  • Northwest Transmission Line: Bell-Irving Route Study

    Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the...
You can also access this registry using the API (see API Docs).