3 datasets found

Tags: grizzly bear groundwater 2010s

Filter Results
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
  • Tenas Project 2017-2018 Baseline Report Final

    This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project.
  • Northwest Transmission Line: Bell-Irving Route Study

    Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the...
You can also access this registry using the API (see API Docs).