-
Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency... -
BWMT Project Reports
This dataset contains eighteen reports initiated by the Babine Watershed Monitoring Trust between 2003 and 2013. -
The Babine River Watershed: An Annotated Bibliography of Inventory, Monitorin...
This bibliography was completed to provide an information base to the Babine Watershed Monitoring Group. This group is being established to coordinate monitoring of resource management plans and activities in the Babine River watershed, in North Central BC. -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Options for the Babine River Area
Land management strategies and access route options for the Babine River planning area. -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Monitoring Land Use and Human Activities and Assessing their Potential Effect...
As a species of special concern in the Babine Watershed, grizzly bears are given specific consideration in the development of the Bulkley Land and Resource Management Plan and Kispiox Land and Resource Management Plan. This study develops a conceptualized... -
Monitoring Land Use Planning to Maintain Grizzly Bears Project 2009-3
This report aims to support monitoring for the implementation and effectiveness of land use planning for achieving management and conservation goals to maintain grizzly bears over the long term in the Babine Watershed Monitoring Trust area of interest. -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s distribution of information during the Application Review; report on whether the... -
Grizzly Bear Workshop May 2013: Babine Watershed
This summary captures discussion among grizzly bear experts and interested parties about monitoring needs in the Babine Watershed. -
Davidson Project Description
Blue Pearl Mining is proposing to develop the Davidson deposit as an underground mine and to transport the ore off-site for processing. The Davidson deposit is situated a distance of 2 km into the east side of Hudson Bay Mountain at an elevation of...