-
Watershed Status Evaluation: An Assessment of 71 Watersheds Meeting BC's Fish...
This pilot project used the WSE Tier I GIS-based methods described in Porter et al. (2013) to assess the watershed indicator “risk” status of 71 watersheds across most of British Columbia’s natural resource regions. Measured values for as many as nine... -
Provincial Stream Crossing Information System (PSCIS) Remediation Sites
Points where a barrier to fish passage has been rectified or remediated. This is the third phase in the process and can only follow after (1) an assessment has been performed on a stream crossing structure and has found that structure to be a barrier to... -
Provincial Stream Crossing Information System (PSCIS) Habitat Confirmation Sites
Points where an evaluation of the fish habitat up and downstream of a road crossing have been carried out. Phase 2 of 4 in the Fish Passage Workflow, Habitat Confirmations are done at sites where the crossing structure is known to be a failure. The Habitat... -
Provincial Stream Crossing Information System (PSCIS) Design Proposal Sites
Points where a fish passage assessment has been performed on a stream crossing structure and found to be a failure. Design points have been identified as a priority for remediation based on a variety of potential criteria: quality of habitat upstream,... -
Lower Skeena Fish Passage: Closed Bottom Structure Assessments 2009
This project included the planning, data collection and analysis phases of closed bottom structure assessments for the purpose of identifying fish passage barriers in need of restoration within the Lower Skeena priority area. The purpose of the project is...