-
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Annual Compendium of Aquatic Rehabilitation Projects for the Watershed Restor...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring rehabilitation of logging-impacted hill slopes, riparian areas, and streams. -
Upper Bulkley River and Toboggan Creek Overwintering Studies
An overwintering study was conducted over three winters (November 1998 to March 2001) in the Upper Bulkley and Toboggan Creek watersheds in north-central British Columbia. The study area includes the lower portion of the Upper Bulkley watershed upstream of... -
Toboggan Creek: a Report on the Results of Field Work Undertaken by the Bulkl...
In 1978 the Bulkley Valley Steelhead Society obtained a $1,000 grant under the Salmonid Enhancement Program to construct and operate a counting fence and fish trap on Toboggan Creek. From September 1 to October 27, a total of 164 pinks, 817 coho and 8... -
Toboggan Creek Watershed Restoration Project
These reports present the information found during the Toboggan Creek Watershed Restoration Project. This project assessed the historical background of the watershed, including a review of fish, fish habitat, impacts, and water quality. Furthermore, the... -
Stream Inventory: Fenton Creek and Adjacent Tributaries 1997
This survey provides an assessment of fish presence/absence in Fenton Creek and its adjacent tributaries. It identifies stream gradients and reasons for obstructed fish passage, and identifies key habitat features that require special management attention.... -
Salmonid Habitat Sensitivity Mapping Morice Forest District: Summary Report
In 1997, the British Columbia Conservation Foundation (BCCF) was contracted by the Department of Fisheries and Oceans (DFO) to produce a map that would allow licensees and contractors to direct their referrals more efficiently. DFO was receiving referrals... -
Reconnaissance (1:20,000) Fish and Fish Habitat Stream Inventory Re-Sampling ...
The main objectives of the 1:20,000 fish and fish habitat reconnaissance level stream inventory project in lower Buck Creek watershed were: to review and summarize historical fisheries information for the study area, to describe fish distribution and... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory of Tributaries to t...
The main objectives of the watershed reconnaissance level stream inventory project in the tributaries to the Skeena River and in White Creek (Lakelse watershed, Skeena drainage) were to review and summarize historical fisheries information for the study... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory of Tributaries to W...
Portions of the Fulton River watershed, and a series of inlet streams to the west shore of Babine Lake between the Fulton River and Newman Island were surveyed in July 1997, June 1999, July— August 2000, and July — August 2001 to assess fish habitat... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory at Three Sub-basins...
The Morrison Creek watershed is the fourth largest drainage in the Babine Lake watershed group. Morrison Creek drains into the Morrison Arm of Babine Lake approximately 28 km north of Granisle, B.C.. The entire area is within the Morice Forest District... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Tributaries in the ...
The objective of this project was to conduct a Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in several watersheds within the Bulkley River (BULK) watershed group. These inventories have a multi-phased approach with six phases required to... -
Morice River Stream Survey August 1975
A survey investigating the fish, and especially the steelhead values, of the small feeder creeks of the Morice River was conducted from August 6-15, 1975. The biological data included fish species present, invertebrates, in-stream and bank vegetation,... -
Maxan Watershed Stream Habitat Restoration and Enhancement Level 2 Design Rep...
AGRA Earth & Environmental Limited (AEE) was retained by Dz'ilh K'Az Kwa Development Corporation (DKK) to design stream habitat restoration and enhancement measures in the Maxan watershed. -
Habitat Improvement and Outplanting Possibilities - Upper Bulkley/ Morice Sys...
The NCD Habitat Unit, along with coho biologists from the Science Branch, conducted a juvenile coho sampling program on the Upper Bulkley/Morice River systems during the month of August from 1987 to 1990. This study furthers the understanding of coho... -
Fisheries Background Studies Morrison Watershed 2004
This report summarizes background fisheries information available for the Morrison Watershed. It focuses on Morrison Creek, Morrison Lake, and its inlet tributaries, with the objective of providing an overview of the fisheries resources of the entire... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
Effects of Beaver on Juvenile Coho Salmon Habitat in Kispiox River Tributaries
The purpose of this study was to collect data to determine how beaver dams might affect coho populations in tributaries of the Kispiox River, and to provide a review of the literature on the effects of beaver activity on salmonid populations. -
Copper Creek (Q.C.I.) Steelhead Trout: A Report on the Effect of Non Random R...
The prime purpose for this study was to determine if the number of steelhead kelts caught in a tidal gill net sockeye salmon fishery could be reduced. Subsequently, the objectives were expanded to generate information on steelhead population size, patterns... -
Aurora LNG Freshwater Fish and Fish Habitat Final Report 2014-2015
The objective of the Freshwater Fish and Fish Habitat Program was to conduct field surveys of streams within and adjacent to the Project area (i.e., location of LNG plant infrastructure and ancillary facilities on Digby Island). This report presents the...