-
Fish Passage GIS Analysis Version 2 Methodology and Output Data Specification...
The BC Land Based Investment (LBI) fish passage program is focused on remediating stream crossings that impede freshwater fish migration. The most common barrier to fish is improperly designed and installed closed bottom structures such as culverts.... -
Reconnaissance Survey of Buckley Lake
This document contains information about Buckley lake habitat quality. Information recorded includes physical, chemical, temperature, oxygen, obstruction and pollutions, stocking, access, and habitation data. Maps and images are also included. -
Reconnaissance Level Fish and Fish Habitat Inventory for the Kispiox Forest D...
Forest Renewal BC is implementing fish and fish habitat inventories to provide information required for resource planning. Triton's goals were to describe fish distributions and habitat characteristics, and to provide stream classifications according to the... -
Provincial Stream Crossing Information System (PSCIS) Remediation Sites
Points where a barrier to fish passage has been rectified or remediated. This is the third phase in the process and can only follow after (1) an assessment has been performed on a stream crossing structure and has found that structure to be a barrier to... -
Provincial Stream Crossing Information System (PSCIS) Habitat Confirmation Sites
Points where an evaluation of the fish habitat up and downstream of a road crossing have been carried out. Phase 2 of 4 in the Fish Passage Workflow, Habitat Confirmations are done at sites where the crossing structure is known to be a failure. The Habitat... -
Provincial Stream Crossing Information System (PSCIS) Assessment Sites
Points where a fish passage assessment has been performed on a stream crossing structure. These includes culverts, bridges, fords, etc. The assessments are carried out to determine whether fish are able to migrate through the structure. -
Provincial Stream Crossing Information System (PSCIS) Design Proposal Sites
Points where a fish passage assessment has been performed on a stream crossing structure and found to be a failure. Design points have been identified as a priority for remediation based on a variety of potential criteria: quality of habitat upstream,...