Upper Bulkley River Watershed Stream Surveys Summer 2007
A stream assessment study was conducted between July and August 2007 for several creeks in the Bulkley River watershed east of Houston, British Columbia. The study area consisted of five creeks of interest - Richfield Creek, Johnny David Creek, Byman Creek,... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Tributaries in the ...
The objective of this project was to conduct a Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in several watersheds within the Bulkley River (BULK) watershed group. These inventories have a multi-phased approach with six phases required to... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Fisheries Background Studies Morrison Watershed 2004
This report summarizes background fisheries information available for the Morrison Watershed. It focuses on Morrison Creek, Morrison Lake, and its inlet tributaries, with the objective of providing an overview of the fisheries resources of the entire... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
Fine-Scaled Population Genetic Structure and Dispersal of Juvenile Steelhead ...
This study used microsatellite markers to characterize fine-scale population structures among populations of juvenile steelhead from tributaries of the Bulkley-Morice River. It applied genotype assignment procedures, similar to those used in genetic stock... -
Chicago Creek Hatchery Operations Final Reports
These final reports include a project background, project objectives and accomplishments, project activity, results, and future objectives. -
Aurora LNG Freshwater Fish and Fish Habitat Final Report 2014-2015
The objective of the Freshwater Fish and Fish Habitat Program was to conduct field surveys of streams within and adjacent to the Project area (i.e., location of LNG plant infrastructure and ancillary facilities on Digby Island). This report presents the... -
A Fisheries Inventory of some Streams Within the Morrison Lake - Hatchery Arm...
This study had the following objectives: provide a source upon which the habitat protection section of the fish and wildlife branch could base protection guidelines, provide Northwood with an assessment of fishery values and related habitat which would be... -
Suskwa River Steelhead Trout: The 1977 Inventory, Creel Survey and Life Histo...
The 1977 aspect of the Suskwa River project began in July and continued until freeze-up in November. Fish were sampled either with "Gees" traps or by angling. The inventory crew switched to a casual creel survey and an adult steelhead tagging program during...