Analysis and Priority Identification of Existing Fish Passage Data: Bulkley R...
For this project, existing fish passage information in the Bulkley River watershed located near Smithers, British Columbia, was reviewed in order to prioritize and rank culverts for further assessment and/or rehabilitation. A detailed review and... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Annual Compendium of Aquatic Rehabilitation Projects for the Watershed Restor...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring rehabilitation of logging-impacted hill slopes, riparian areas, and streams. -
Wet'suwet'en Submission to the Canadian Environmental Assessment Agency - Pac...
This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific NorthWest LNG project near LeLu Island. -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work, while providing community involvement and focus through trail development and... -
Toboggan Creek: a Report on the Results of Field Work Undertaken by the Bulkl...
In 1978 the Bulkley Valley Steelhead Society obtained a $1,000 grant under the Salmonid Enhancement Program to construct and operate a counting fence and fish trap on Toboggan Creek. From September 1 to October 27, a total of 164 pinks, 817 coho and 8... -
Toboggan Creek Watershed Restoration Project
These reports present the information found during the Toboggan Creek Watershed Restoration Project. This project assessed the historical background of the watershed, including a review of fish, fish habitat, impacts, and water quality. Furthermore, the... -
Summary Report for Toboggan Creek Stream Rehabilitation and Silvern Lakes Roa...
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational access. -
Stream Inventory: Fenton Creek and Adjacent Tributaries 1997
This survey provides an assessment of fish presence/absence in Fenton Creek and its adjacent tributaries. It identifies stream gradients and reasons for obstructed fish passage, and identifies key habitat features that require special management attention.... -
Salmonid Habitat Sensitivity Mapping Morice Forest District: Summary Report
In 1997, the British Columbia Conservation Foundation (BCCF) was contracted by the Department of Fisheries and Oceans (DFO) to produce a map that would allow licensees and contractors to direct their referrals more efficiently. DFO was receiving referrals... -
Reconnaissance Level Fish and Fish Habitat Inventory for the Kispiox Forest D...
Forest Renewal BC is implementing fish and fish habitat inventories to provide information required for resource planning. Triton's goals were to describe fish distributions and habitat characteristics, and to provide stream classifications according to the... -
Reconnaissance Fish and Fish Habitat Inventory of the Middle Skeena River Tri...
This fish and fish habitat inventory provides information regarding fish species presence, distribution, and relative abundance, as well as stream reach biophysical data, for use in interpretation of habitat sensitivity and capability for fish production. -
Reconnaissance (1:20,000) Fish and Fish Habitat Stream Inventory Re-Sampling ...
The main objectives of the 1:20,000 fish and fish habitat reconnaissance level stream inventory project in lower Buck Creek watershed were: to review and summarize historical fisheries information for the study area, to describe fish distribution and... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory of Tributaries to t...
The main objectives of the watershed reconnaissance level stream inventory project in the tributaries to the Skeena River and in White Creek (Lakelse watershed, Skeena drainage) were to review and summarize historical fisheries information for the study... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Re-sampling of Pete...
This report summarizes past fish inventory efforts and results in context with data collected during re-sampling to present a comprehensive picture of fish distribution in the upper Peter-Aleck drainage. -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Morice River Stream Survey August 1975
A survey investigating the fish, and especially the steelhead values, of the small feeder creeks of the Morice River was conducted from August 6-15, 1975. The biological data included fish species present, invertebrates, in-stream and bank vegetation,... -
Morice Fish and Aquatic Habitat Review 2013
The purpose of this project is to document alterations and impacts to Wet’suwet’en land and resources, particularly in regard to anadromous and freshwater resident fish and their habitats in Morice watershed. Alterations and impacts resulting from... -
Maxan Watershed Stream Habitat Restoration and Enhancement Level 2 Design Rep...
AGRA Earth & Environmental Limited (AEE) was retained by Dz'ilh K'Az Kwa Development Corporation (DKK) to design stream habitat restoration and enhancement measures in the Maxan watershed. -
Fish Passage Culvert Inspections
This project was implemented to assess fish passage at culvert-bearing stream crossings. These assessments were carried out at culvert crossings installed on fish-bearing streams on roads primarily constructed prior to the implementation of the Forest...