Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development...
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development Prince Rupert Bulk Loading Facility - Phase 1 and 2 Phase 1: Bulk Marine Terminal Sites (Engineering Aspects) Phase 2: Environmental Assessment of Alternatives Northcoast... -
An Investigation into the Feasibility of Modifying Derelict Dams to Improve S...
Skeena Fisheries Commission (SFC), in partnership with the Lax Kw’alaams Fisheries Program conducted a feasibility assessment to determine whether salmon productivity in the Kloiya River and Rainbow Lake watersheds could be improved by modifying a series of... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Superport Development Preliminary Environmental Effect Assessment
A preliminary environmental effects assessment relating to the potential port sites identified in the Port Development Study by Wright Engineers Limited for the National Harbours Board. -
Riparian and In-Stream Assessment of the Bulkley River System: An Examination...
Sixty-eight tributaries to the Bulkley River were examined by topographic maps and air photo interpretation to assess the degree and nature of the impacts on these streams by transportation and hydro-electric powerline corridors and... -
Ridley Island Port Construction Activities - 1982: Background and Environment...
This report contains the findings of an EPS program carried out in the summer of 1982 to monitor the effects on the receiving environment of port construction activities underway on National Harbours Board-owned Ridley Island and vicinity near Prince... -
Pacific Northern Gas Looping Project: Project Description
This report summarizes the Pacific Northern Gas Looping Project by describing the project, areas of federal interest, the resource and material requirements, indigenous engagement, public engagement, project setting, and potential project effects. -
Morrison Copper/Gold Mine Project Third Party Review of Groundwater, Water Qu...
EAO wishes to retain an independent, expert, third party consultant to undertake a technical review of the hydrogeology, hydrology, water balance, water quality, and related aquatic resources and fisheries components of the EA, in particular with a focus on... -
Juvenile Salmonid Habitat Utilization in the Skeena River Estuary
This report examines the salmon habitat utilization of five species of Pacific salmon in the greater Skeena River estuary. In particular, interest is given in salmon habitat utilization in light of several large-scale industrial development projects pending... -
Juvenile Salmon Usage of the Skeena River Estuary
This paper examines the geographic and temporal habitat utilization of juvenile anadromous salmon in the greater Skeena estuary in relation to the footprints of the proposed industrial development projects. These data can help illuminate the current status... -
Grassy Point LNG-Dome Environmental Assessments
Environmental assessments, risk analysis, and proposals for the development of a LNG terminal facilities at Grassy Point. -
Goldcorp Canada Ltd - Equity Division Environmental Report
This report has been prepared in support of the Ministry of Environment permit P.E.4475 and the Ministry of EMNG reclamation permit M-114. This report focuses on the environmental performance of Goldcorp Canada Ltd – Equity Division during 2012. -
Environmental Review of Proposed Port Development in Prince Rupert, B.C.
This report suggests possible port locations in the Prince Rupert area and has formed the basis for subsequent environmental studies. -
Environmental Assessment Office (EAO) - Points (SVW)
The dataset contains projects that are currently, or have been, subject to environmental assessment review. Attributes include the project description, project phase, decision, and proponent name. -
Bulk Liquids Terminal South Kaien Island Prince Rupert, B.C.
This environmental report is part of a 4-volume series of reports which address the proposed bulk liquids terminal at South Kaien Island, Prince Rupert, B.C. -
Bioassessment of Streams in North-Central British Columbia Using the Referenc...
This report outlines results from three years of RCA model development for the Skeena Region. It includes the development of standard methods for collecting and analyzing data for use in the RCA for bio monitoring in the Skeena region, results of...