-
Level I Detailed Field Assessment of Aquatic and Riparian Habitat for Coldwat...
The Watershed Restoration Program of British Columbia is a program whereby watersheds that have been damaged by past logging practices undergo restoration. The program involves a number of steps that commence with an overview study, followed by a detailed... -
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development...
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development Prince Rupert Bulk Loading Facility - Phase 1 and 2 Phase 1: Bulk Marine Terminal Sites (Engineering Aspects) Phase 2: Environmental Assessment of Alternatives Northcoast... -
Zymoetz River Steelhead Trout: A Progress Report on the Zymoetz River Enhance...
Steelhead trout are angled from the Zymoetz River, (locally known as the "Copper") near the City of Terrace on the west coast of British Columbia. The "Copper" was labeled as an "Everyman's River" by Pinsent and Chudyk. Recent studies (Imbleau M.S. 1974;... -
Trout Creek/Kitseguecla Landscape Unit Plan
The Trout Creek Landscape Unit Plan (LUP) outlines the objectives and the strategies for the resource management of the Trout Creek and Toboggan watershed within the Bulkley portion of the Bulkley/Cassiar Forest District. The objectives address core... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Steelhead Stock Assessment, 1983
Management prescriptions for specific waters have been identified. In most situations, these have or will be incorporated into the production program. The immediate future of the stock assessment program should include fine tuning of the production model,... -
Pacific Northern Gas Looping Project: Project Description
This report summarizes the Pacific Northern Gas Looping Project by describing the project, areas of federal interest, the resource and material requirements, indigenous engagement, public engagement, project setting, and potential project effects. -
Lower Skeena Fish Passage: Closed Bottom Structure Assessments 2009
This project included the planning, data collection and analysis phases of closed bottom structure assessments for the purpose of identifying fish passage barriers in need of restoration within the Lower Skeena priority area. The purpose of the project is... -
Letter from Canadian Environmental Assessment Agency Fisheries for the Aurora...
The Canadian Environmental Assessment Agency (the Agency) is writing to inform Fisheries and Oceans Canada that in performing the duties and functions of the responsible authority for the environmental assessment (EA) of the proposed Aurora LNG Project (the... -
Lakelse Lake Draft Management Plan
The lake management planning process devises methods “to preserve and protect the quality and health of the Lakelse watershed”. This management plan marks the end of the first iteration of the process, and is intended to provide long- term direction to the... -
Lakelse Lake Development Capacity
This report shows the results from various analyses such as Boat Limit Method, Shoreline Development Method, Chlorophyll-a Limiting Method, Morpheodaphic and Other Parameters Method to assess the capacity of Lakelse Lake for development. -
Lakelse 2060: A 50 Year Vision for the Lakelse Watershed
The projects in this report are planning exercises based upon the simple thesis, “If you want this specific value in 50 years (be it swimming or water quality or grizzly bears), these are the requirements for that value which must be in place in order for... -
Kitwanga Sockeye Recovery Plan Backgrounder
Kitwanga sockeye abundance has been in decline for the last five decades. Constraints to sockeye production are not well understood; it is thought they stem from a combination of problems that include high harvest rates in the management of the Skeena River... -
Implementing a Freshwater Salmon Habitat Monitoring Program in the Skeena Wat...
This project develops a framework for implementing a collaborative freshwater salmon habitat-monitoring program in the Skeena watershed. Its purpose is to help catalyze federal Wild Salmon Policy strategy 2 implementation and stimulate ecosystem based... -
Grassy Point LNG-Dome Environmental Assessments
Environmental assessments, risk analysis, and proposals for the development of a LNG terminal facilities at Grassy Point. -
Environmental Review of Proposed Port Development in Prince Rupert, B.C.
This report suggests possible port locations in the Prince Rupert area and has formed the basis for subsequent environmental studies. -
Bioassessment of Streams in North-Central British Columbia Using the Referenc...
This report outlines results from three years of RCA model development for the Skeena Region. It includes the development of standard methods for collecting and analyzing data for use in the RCA for bio monitoring in the Skeena region, results of... -
An Assessment of the Effects on the Morice and Bulkley River Systems of a Pul...
This report assesses the economic and biological consequences of further development at Houston, B.C. The first part of this paper identifies the geographic and biological aspects of the Bulkley River system and evaluates, in dollar terms, the commercial,... -
Stream Inventory: Owen Creek Watershed 1998
An aquatic inventory was conducted in the Owen Creek Watershed from late June through mid-August 1998. These studies were a continuation of an aquatic inventory program initiated in 1996 in the Thautil and Owen Operating Areas (Morice TSA 20). The major...