-
Water Quality Objectives for Bulkley and Morice Rivers (1986)
This report includes an assessment of present water quality, a prediction of future water quality, recommended water uses that should be protected, and recommended monitoring to check whether those objectives are being met and to develop future objectives. -
Skeena-Nass Area Water Quality Assessment and Objectives: Technical Appendix
This report assess present water quality of the mainstem Bulkley and Morice Rivers, to predict future water quality, and to recommend water uses that should be protected, and to recommend provisional water quality objectives to protect those uses. -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,... -
Ongoing Legacy of Metal Mines on Babine Lake
An assessment of discharge regulation, aquatic monitoring, and aquatic impacts related to Bell and Granisle Mines. -
Goldcorp Canada Ltd - Equity Division Environmental Report
This report has been prepared in support of the Ministry of Environment permit P.E.4475 and the Ministry of EMNG reclamation permit M-114. This report focuses on the environmental performance of Goldcorp Canada Ltd – Equity Division during 2012. -
Environmental and Reclamation Measures Equity Silver Mines Ltd. - 1988
The purpose of this paper is to summarize rehabilitation measures, reclamation programmes, costs, equipment selection, and research carried out at Equity Silver Mines Limited. -
Environmental and Reclamation Measures Equity Silver Mines Ltd. - 1987
The purpose of this paper will be to offer a brief overview of these measures. Key topics for discussion will be: kinetics of Acid Mine Drainage, acid generating potential, water treatment and sludge handling, special wastes, waste dump construction, waste...