Watershed Assessment of the Kitseguekla Community Watershed
At the request of Skeena Cellulose Inc. Carnaby Division, a Watershed Assessment of the Kits Creek watershed was conducted by Freshwater Resources of Smithers, B.C. The assessment was conducted because the Kits creek watershed is the Community Watershed for... -
Water Quality Objectives for Bulkley and Morice Rivers (1986)
This report includes an assessment of present water quality, a prediction of future water quality, recommended water uses that should be protected, and recommended monitoring to check whether those objectives are being met and to develop future objectives. -
Water Quality Assessment and Objectives for Toboggan Creek and Tributaries: T...
The purpose of this report is to assess the water quality and aquatic ecosystem data gathered to date and to recommend water quality objectives specific to the Toboggan Creek watershed. Designated water uses, to be protected by water quality objectives, are... -
Water Monitoring in British Columbia: Scanning the Data Landscape Public Report
The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and quantity monitoring and reporting in British Columbia, providing examples of who is... -
Skeena-Nass Area Water Quality Assessment and Objectives: Technical Appendix
This report assess present water quality of the mainstem Bulkley and Morice Rivers, to predict future water quality, and to recommend water uses that should be protected, and to recommend provisional water quality objectives to protect those uses. -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,... -
Northwest Water Tool
The Northwest Water Tool was developed for the Ministry of Forests, Lands and Natural Resource Operations to provide guidance on water availability across northwest BC and to support the decision-making process for water use approvals and licences. The... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Hydrology Section Report: Skeena Region Low Flow Memorandum
This document contains memoranda concerning estimates of low flows of designated streams in the Skeena Region. The purpose of the low flow estimates is to assess the availability of water to supply current and potential water licenses at designated stream... -
Dahlie Creek Salmonid Overwintering and Water Quality Studies: Interim Report
This document contains a detailed fish habitat, riparian, and channel assessment of Dahlie Creek. Low channel complexity, removal of riparian vegetation, culvert obstructions to fish passage, sedimentation, altered flow regime, and channelization were some... -
Consequences of Unregulated Release of Raw Acid Mine Drainage into the Bulkle...
Approximately 800 000 m3 of acid mine drainage (AMD) is generated per year at the Equity Silver Mine southeast of Houston. This AMD would have devastating effects on the Bulkley River if it was allowed to flow untreated from the property for a prolonged...