Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en response in respect of the proposed Coastal GasLink pipeline project within... -
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect of the proposed Northern Gateway project within Wet'suwet'en territory. The... -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from forest development and harvesting activities. Recommendations for further... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Reconnaissance Level Fish and Fish Habitat Inventory for the Kispiox Forest D...
Forest Renewal BC is implementing fish and fish habitat inventories to provide information required for resource planning. Triton's goals were to describe fish distributions and habitat characteristics, and to provide stream classifications according to the... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Subdrainages in the...
The objective of this project was to conduct a Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in several drainages in the Bulkley River watershed. This included portions of the Crow and Maxan Creek watersheds in addition to three small... -
Preliminary Survey of Juvenile Salmonid Rearing Habitat Summer 1976: Upper Ki...
A preliminary study of the juvenile salmonid populations of the Upper Kalum River and its tributaries was conducted during August 1976. The objectives of the study were: to locate and describe the preferred rearing habitat of juvenile salmonids in the Kalum... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the construction of a Tailings Storage Facility, including tailings and seepage control dams,... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Fisheries Background Studies Morrison Watershed 2004
This report summarizes background fisheries information available for the Morrison Watershed. It focuses on Morrison Creek, Morrison Lake, and its inlet tributaries, with the objective of providing an overview of the fisheries resources of the entire... -
Fish and Fish Habitat Inventory for Forest Licences A-16823 and A-16825 Endak...
Nine sub-drainages were surveyed within the area covered by this report. The predominant objectives of this project were to provide reach-specific information on fish distribution, habitat, and all relevant information on surveyed streams that would... -
Fish Habitat Inventory & Information Program: Stream Summary Catalogue
This catalogue contains a summary of information on fish and fish habitats for 83 streams in the DFO Subdistrict 4D, Smithers, Volume 2 (Bulkley). The catalogue is organized as follows: Map indices, user guides, streams summaries, bibliography, and stream... -
Creel Surveys of the Lakelse Lake Cutthroat Sport Fishery
These reports study the sport fishery for cutthroat trout in the Lakelse watershed. They include a description of the study area, the resident species, angler effort and success, angler distribution, and cutthroat trout life history. -
Catalogue of Salmon Streams and Spawning Escapements of Statistical Area 4 (U...
This resource from Ecocat is a catalogue containing each stream's location, spawning distribution, barriers and points of difficult ascent, escapement records, and other general data pertaining to the stream. The catalogue also includes a topographical map... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Un...
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management Unit (IRM). The objectives were to conduct a literature review of inventory... -
A Review of the Effects Assessment for the Morrison Copper/Gold Project
An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application for an Environmental Assessment Certificate. During the course of the Project...