Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the construction of a Tailings Storage Facility, including tailings and seepage control dams,... -
Aurora LNG Freshwater Fish and Fish Habitat Final Report 2014-2015
The objective of the Freshwater Fish and Fish Habitat Program was to conduct field surveys of streams within and adjacent to the Project area (i.e., location of LNG plant infrastructure and ancillary facilities on Digby Island). This report presents the... -
A Review of the Effects Assessment for the Morrison Copper/Gold Project
An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application for an Environmental Assessment Certificate. During the course of the Project...