Davidson Project Meteorology and Hydrology Baseline Report 2006-2008
This meteorology and hydrology baseline report summarizes results from 2006, 2007, and 2008 from the Davidson meteorology station and for 6 hydrometric stations established for the Davidson Project. It also includes available data from government operated... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Site-Specific Water Quality Guidelines for Skeena River at Usk for the Purpos...
Site-specific water quality guidelines for the Skeena River at Usk for the purpose of national reporting (May 2005). This document is one in a series that presents ambient site-specific water quality guidelines (SSGs) for British Columbia and the Yukon.... -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Nutrients and Algae in the Upper Bulkley River watershed 1997-2000
This study focused on the diffuse sources of nutrients and the trophic status of the Upper Bulkley River. Monthly water chemistry monitoring of the Upper Bulkley and tributaries was conducted between November 1997 and March 2000, and the end of growing... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Kathlyn, Seymour, Round, and Tyhee Lakes: Water Quality Assessment and Object...
This study quantifies the inputs of phosphorus from various sources and determines the extent to which additional phosphorus could be tolerated by each lake without a serious decrease in water quality. Based on this information, appropriate land uses and... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
BC Water Portal
Water quantity (streams and wells) and water quality (surface and ground) monitoring stations maintained by the Environmental Monitoring System, Northern Health Authority, BC Oil and Gas Commission, Water Survey of Canada, BC Environmental Assessment... -
BC Surface Water Monitoring Sites
The Surface Water Monitoring Sites web application allows users to browse a map interface to find freshwater monitoring locations throughout BC. Clicking on a station provides the name and description of the water quality monitoring station as well as... -
BC Environmental Monitoring System Results
The Environmental Monitoring System (EMS) test results as .csv files available for download. Results include physical, chemical and biological analyses of samples taken from water, air, solid waste discharges and ambient monitoring sites throughout the... -
BC Environmental Monitoring System (EMS)
The Environmental Monitoring System (EMS), is the Ministry of Environment corporate electronic repository for the capture and extraction of results for chemical, physical and biological analysis performed on air, water, biological, solid waste discharge,... -
B.C. Timber Pulp Mill, Porpoise Harbour An Assessment of Mill Impact on the R...
This report presents data collected from June 1979 to April 1982 relating to water quality, sediment, organic and trace metal content, and benthic invertebrates from the vicinity of the B.C. Timber pulp mill, Porpoise Harbour. -
Environmental Impact Information of the Proposed Equity Mining Capital Ltd. D...
During 1974, Environment Canada undertook an additional study of the watershed adjacent to Equity Mining Capital Ltd.'s proposed development near Goosly Lake to supplement water quality baselines established in 1973. Chemistry analysis and 96 hour LC50...