Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Juvenile Coho Salmon and Steelhead Assessment of Lower Toboggan Creek, Septem...
Juvenile sampling and habitat assessment was conducted in the lower three kilometers of Toboggan Creek from September to November, 1998. The lower two kilometers of the stream is of lower habitat quality (higher gradient, greater velocity, little cover)... -
2008 Stream Assessment for Select Areas and Road Crossings within Nadina Fore...
This report summarizes the results of the stream assessments, which were completed between July 14 and October 22, 2008. All evaluated drainages are within the Babine Lake (BABL), Babine River (BABR), Bulkley River (BULK), Francois Lake (FRAN), Morice River... -
The Potential Effects of Cadmium and Other Mixed Metal Mining Effluents on Fi...
This review is a qualitative assessment of existing data and a review of relevant primary literature. The objective of this review is to assess the potential effects of elements released from the Morrison Copper/Gold Project on fish assemblages in Morrison... -
Suskwa River Steelhead Trout: The 1977 Inventory, Creel Survey and Life Histo...
The 1977 aspect of the Suskwa River project began in July and continued until freeze-up in November. Fish were sampled either with "Gees" traps or by angling. The inventory crew switched to a casual creel survey and an adult steelhead tagging program during...