Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Detailed Fish Habitat, Riparian and Channel Assessment for Select Central Bul...
Land use activities have had a significant impact on many of the tributaries within the central Bulkley River watershed. Preliminary air photo analysis has indicated that high value fish habitat has been moderately to severely impacted in a large proportion... -
Upper Bulkley River and Toboggan Creek Overwintering Studies
An overwintering study was conducted over three winters (November 1998 to March 2001) in the Upper Bulkley and Toboggan Creek watersheds in north-central British Columbia. The study area includes the lower portion of the Upper Bulkley watershed upstream of... -
Upper Bulkley River Steelhead Population Monitoring
The upper Bulkley River system, near Houston, was first assessed by the Fish Habitat Improvement Section in 1981. The initial assessment identified probably areas of importance for steelhead recruitment and juvenile rearing. In 1982 an index sampling... -
The Maxan Lake Multi-Land Use Study: A Summary Review
The objective of the Maxan Lake multi-land use study was to examine the interaction between various forms of land use on an area having multi-use capacity. To this end, various studies were conducted to examine different aspects of this complex subject. The... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Salmonid Habitat Sensitivity Mapping Morice Forest District: Summary Report
In 1997, the British Columbia Conservation Foundation (BCCF) was contracted by the Department of Fisheries and Oceans (DFO) to produce a map that would allow licensees and contractors to direct their referrals more efficiently. DFO was receiving referrals... -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,... -
Reconnaissance Report: Upper Bulkley River Steelhead Population Monitoring
The purpose of this report is to outline results of the 1983 steelhead fry recruitment monitoring program in the upper Bulkley system. The conclusion is that a larger fry population existed in 1983 than in 1981 or 1982. This data will serve as valuable... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water... -
Kathlyn, Seymour, Round, and Tyhee Lakes: Water Quality Assessment and Object...
This study quantifies the inputs of phosphorus from various sources and determines the extent to which additional phosphorus could be tolerated by each lake without a serious decrease in water quality. Based on this information, appropriate land uses and... -
Fish-Stream Identification: Lakes Forest District Small Business Forest Enter...
The main objectives of this project were: to conduct a literature review of inventory activities previously conducted in the area; to conduct stream classification in accordance with guidelines in the Fish- stream Identification guidebook (FPC); to... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
Fish Monitoring Studies in Buck, Foxy and Crow Creeks and Goosly Lake
These reports present the results of the 2012 and 2017 fish monitoring programs conducted in the vicinity of Equity Mine near Houston BC. -
Buck Creek Juvenile Salmon Trapping Programs
Juvenile coho, chinook, and rainbow trout/steelhead were sampled for the second and third consecutive years in Buck Creek using a rotary screw trap RST. The RST was sampled nightly to collect data on discharge, water temperature, and trap performance were... -
Assessment of Steelhead Enhancement Opportunities in the Morice River System
Juvenile salmonid populations in two tributary streams to the Morice River system, Owen and Lamprey Creeks, were assessed by the Fish Habitat Improvement Section in the fall of 1980. Objectives were directed at steelhead enhancement opportunities in the two... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Un...
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management Unit (IRM). The objectives were to conduct a literature review of inventory...