12 datasets found

Tags: discharge ph Licenses: Other (Not Open)

Filter Results
  • Review of Cattle-Community Watershed Conflicts in the Skeena Region

    This report provides the B.C. Ministry of Environment, Lands & Parks (BCE) with a review of cattle farming in the Skeena Region, and a recommendation for monitoring the impact of cattle and other livestock operations on community watersheds, including...
  • Technical Data Reports for Enbridge Northern Gateway Project

    Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat...
  • Vopak Pacific Canada Project Description

    The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where...
  • Upper Bulkley River and Toboggan Creek Overwintering Studies

    An overwintering study was conducted over three winters (November 1998 to March 2001) in the Upper Bulkley and Toboggan Creek watersheds in north-central British Columbia. The study area includes the lower portion of the Upper Bulkley watershed upstream of...
  • Upper Bulkley River Steelhead Population Monitoring

    The upper Bulkley River system, near Houston, was first assessed by the Fish Habitat Improvement Section in 1981. The initial assessment identified probably areas of importance for steelhead recruitment and juvenile rearing. In 1982 an index sampling...
  • The Maxan Lake Multi-Land Use Study: A Summary Review

    The objective of the Maxan Lake multi-land use study was to examine the interaction between various forms of land use on an area having multi-use capacity. To this end, various studies were conducted to examine different aspects of this complex subject. The...
  • The Flooded Tailings Impoundment at the Equity Silver Mine

    The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This...
  • Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document

    This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of...
  • Site-Specific Water Quality Guidelines for Skeena River at Usk for the Purpos...

    Site-specific water quality guidelines for the Skeena River at Usk for the purpose of national reporting (May 2005). This document is one in a series that presents ambient site-specific water quality guidelines (SSGs) for British Columbia and the Yukon....
  • Sampling of Metals and Aquatic Life in the Bulkley River Adjacent to the Form...

    This study was carried out to monitor the effects, if any, of the former Topley Concentrate Shed Site ("Topley Site") on concentrations of dissolved and total metals and other parameters and on aquatic life in the Bulkley River. The study included three...
  • Pacific Northwest LNG: Project Description

    Pacific NorthWest LNG Limited Partnership (PNW LNG) is proposing to construct and operate a liquefied natural gas (LNG) export facility within the District of Port Edward, British Columbia (BC). This report outlines the procedures and plans for the...
  • Morrison Copper/Gold Project 3rd Party Review Response Report

    This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water...
You can also access this registry using the API (see API Docs).