Review of Cattle-Community Watershed Conflicts in the Skeena Region
This report provides the B.C. Ministry of Environment, Lands & Parks (BCE) with a review of cattle farming in the Skeena Region, and a recommendation for monitoring the impact of cattle and other livestock operations on community watersheds, including... -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Site-Specific Water Quality Guidelines for Skeena River at Usk for the Purpos...
Site-specific water quality guidelines for the Skeena River at Usk for the purpose of national reporting (May 2005). This document is one in a series that presents ambient site-specific water quality guidelines (SSGs) for British Columbia and the Yukon.... -
Sampling of Metals and Aquatic Life in the Bulkley River Adjacent to the Form...
This study was carried out to monitor the effects, if any, of the former Topley Concentrate Shed Site ("Topley Site") on concentrations of dissolved and total metals and other parameters and on aquatic life in the Bulkley River. The study included three... -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water... -
Kathlyn, Seymour, Round, and Tyhee Lakes: Water Quality Assessment and Object...
This study quantifies the inputs of phosphorus from various sources and determines the extent to which additional phosphorus could be tolerated by each lake without a serious decrease in water quality. Based on this information, appropriate land uses and... -
Fish Monitoring Studies in Buck, Foxy and Crow Creeks and Goosly Lake
These reports present the results of the 2012 and 2017 fish monitoring programs conducted in the vicinity of Equity Mine near Houston BC. -
B.C. Timber Pulp Mill, Porpoise Harbour An Assessment of Mill Impact on the R...
This report presents data collected from June 1979 to April 1982 relating to water quality, sediment, organic and trace metal content, and benthic invertebrates from the vicinity of the B.C. Timber pulp mill, Porpoise Harbour. -
2012 Sustainability Report Closed Sites in Honduras, Mexico, the United State...
The focus of this report is on Goldcorp’s one closed site in Honduras (San Martin), one closed site in Mexico (Nukay in Guerrero), four closed sites in the United States (Dee and Daisy in Nevada, Rand in California, and Golden Reward in South Dakota) and... -
The Potential Effects of Cadmium and Other Mixed Metal Mining Effluents on Fi...
This review is a qualitative assessment of existing data and a review of relevant primary literature. The objective of this review is to assess the potential effects of elements released from the Morrison Copper/Gold Project on fish assemblages in Morrison... -
Environmental Impact Information of the Proposed Equity Mining Capital Ltd. D...
During 1974, Environment Canada undertook an additional study of the watershed adjacent to Equity Mining Capital Ltd.'s proposed development near Goosly Lake to supplement water quality baselines established in 1973. Chemistry analysis and 96 hour LC50...