-
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Watershed Assessment of the Kitseguekla Community Watershed
At the request of Skeena Cellulose Inc. Carnaby Division, a Watershed Assessment of the Kits Creek watershed was conducted by Freshwater Resources of Smithers, B.C. The assessment was conducted because the Kits creek watershed is the Community Watershed for... -
Water Temperature, River Discharge, and Adult Sockeye Salmon Migration Observ...
Water temperature, river discharge, and adult sockeye salmon migration observations in the Babine watershed, 1946-2014. Historical meteorological and hydrological data were assembled to review the influence of changes in these environmental factors on... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where... -
Upper Bulkley Floodplain Habitat: Modifications, Physical Barriers, and Sites...
The Bulkley River upstream of the Morice River has some of the most intense public and private land use in the Skeena watershed. The purpose of this assessment was to document human-induced modifications to floodplain habitat and river channelization,... -
Upper Bulkley Fish and Aquatic Review: Stream Flow, Surface Water Licenses an...
Upper Bulkley fish and aquatic review: stream flow, surface water licenses and groundwater wells. The Upper Bulkley Fish and Aquatic Review Project produced a set of analyses focused on select pressure and quantity indicators as determined by the Wild... -
Streamflow Trends in the Skeena Region
This report is intended to improve the ability of the proponents of major projects (e.g., mines, run-of-river power projects) and the responsible regulatory agencies to address the potential impacts to the project resulting from streamflow regime changes.... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Site-Specific Water Quality Guidelines for Skeena River at Usk for the Purpos...
Site-specific water quality guidelines for the Skeena River at Usk for the purpose of national reporting (May 2005). This document is one in a series that presents ambient site-specific water quality guidelines (SSGs) for British Columbia and the Yukon.... -
Sediment Source Mapping, Detailed Channel Assessment, and Reconnaissance Sedi...
Sediment source mapping, detailed channel assessment, and reconnaissance sediment budget for Williams Creek for the period 1949 to 2001. This study has two components: (1) sediment source mapping and reconnaissance sediment budgeting upslope of the alluvial... -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,... -
Reinstallation of Historic Water Survey of Canada Staff Gauges, Upper Bulkley...
Nadina Community Futures (NCF) of Houston, BC, has implemented a program of water level monitoring in the Upper Bulkley River watershed to determine effects of resource development on the hydrologic regime in the watershed. To facilitate this monitoring,... -
Preliminary Assessment of Overwintering Habitat in the Morice Watershed
This preliminary data report examines potential indicators of overwintering habitat quality and some potential factors which may affect the the overwintering habitat quality. -
Northwest Water Tool
The Northwest Water Tool was developed for the Ministry of Forests, Lands and Natural Resource Operations to provide guidance on water availability across northwest BC and to support the decision-making process for water use approvals and licences. The... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water... -
Kathlyn, Seymour, Round, and Tyhee Lakes: Water Quality Assessment and Object...
This study quantifies the inputs of phosphorus from various sources and determines the extent to which additional phosphorus could be tolerated by each lake without a serious decrease in water quality. Based on this information, appropriate land uses and... -
Juvenile Coho Salmon and Steelhead Assessment of Lower Toboggan Creek, Septem...
Juvenile sampling and habitat assessment was conducted in the lower three kilometers of Toboggan Creek from September to November, 1998. The lower two kilometers of the stream is of lower habitat quality (higher gradient, greater velocity, little cover)...