Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Conserving Skeena Fish Populations and their Habitat
This report constitutes the Skeena Watershed Fish Sustainability Process Stage I document. Conserving Skeena Fish Populations and Their Habitat describes the planning process that includes prioritizing and selecting sub-basins to review. A biophysical... -
Westcoast Connector Gas Transmission Project: Conceptual Freshwater Fish Habi...
This freshwater CFHOP outlines the strategy and framework for development of the Final Fish Habitat Offsetting Plan (FHOP). A marine CFHOP companion document has also been prepared. The FHOP will be developed via discussions with regulatory agencies and... -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use Activit...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and hatchery fish, primarily coho, pink, steelhead and Dolly Varden, with smaller... -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from forest development and harvesting activities. Recommendations for further... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and the lower Telkwa... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Nisga'a Lands Freshwater Fish and Fish Habitat Technical Data Report for the ...
This report summarizes field data collected in 2014 for fish and fish habitat along the proposed application corridors within Nisga’a Lands. Fish and fish habitat information and field results for the remainder of the proposed project were collected in 2012... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Mid-Bulkley Overview Fish and Fish Habitat Assessment for Watershed Restoration
An overview fish and fish habitat assessment in the sub-basins of the Mid-Bulkley Watershed that: determines what fish species are at risk to the impacts of poor land-use practices in the watershed; identifies areas of concern that need to be examined in... -
Mid-Bulkley Detailed Fish Habitat/Riparian/Channel Assessment for Watershed R...
The Fish Habitat and Assessment Procedure (FHAP) is a means of assessing watersheds with a history of anthropogenic activity for impacts to fish and fish habitats using a set of integrated physical and biological indicators. For each area in the Mid-Bulkley... -
Kitsumkalum Traditional Use Study Interim Report for Pacific Northwest LNG/Pe...
This interim report summarizes the written literature on the Kitsumkalum First Nation in regards to their traditional land use practices within their traditional territory. However, a majority of authors have discussed the Tsimshian more generally and this... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s distribution of information during the Application Review; report on whether the...