-
Impacts of LNG Development to Salmon Habitat on Lelu Island and Flora Bank
This report outlines the unaddressed issues that remain after the mitigation proposal presented by Petronas for a suspension bridge over Flora Bank. -
A Review of Eelgrass Transplanting Projects in the Pacific Northwest
This paper summarises the results of previous eelgrass transplanting projects in order to provide part of the basis upon which to judge the possibility of eelgrass transplanting success in the Northwest. -
The Environmental Implications of Sediment Transport in the Waters of Prince ...
The Environmental Implications of Sediment Transport in the Waters of Prince Rupert, British Columbia, Canada: A Comparison Between Kinematic and Dynamic Approaches. A Sediment Trend Analysis (STA) was performed on 2474 grain-size distributions taken from... -
Maxan Watershed Stream Habitat Restoration and Enhancement Level 2 Design Rep...
AGRA Earth & Environmental Limited (AEE) was retained by Dz'ilh K'Az Kwa Development Corporation (DKK) to design stream habitat restoration and enhancement measures in the Maxan watershed. -
Estuaries of British Columbia's North Coast
This fact sheet provides information on estuaries and an overview of protection plans. -
Environmental Review of Proposed Port Development in Prince Rupert, B.C.
This report suggests possible port locations in the Prince Rupert area and has formed the basis for subsequent environmental studies. -
Aurora LNG Freshwater Fish and Fish Habitat Final Report 2014-2015
The objective of the Freshwater Fish and Fish Habitat Program was to conduct field surveys of streams within and adjacent to the Project area (i.e., location of LNG plant infrastructure and ancillary facilities on Digby Island). This report presents the...