-
Analysis and Priority Identification of Existing Fish Passage Data: Bulkley R...
For this project, existing fish passage information in the Bulkley River watershed located near Smithers, British Columbia, was reviewed in order to prioritize and rank culverts for further assessment and/or rehabilitation. A detailed review and... -
Detailed Fish Habitat, Riparian and Channel Assessment for Select Central Bul...
Land use activities have had a significant impact on many of the tributaries within the central Bulkley River watershed. Preliminary air photo analysis has indicated that high value fish habitat has been moderately to severely impacted in a large proportion... -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en response in respect of the proposed Coastal GasLink pipeline project within... -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from forest development and harvesting activities. Recommendations for further... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Reconnaissance (1:20,000) Fish and Fish Habitat Stream Inventory Re-Sampling ...
The main objectives of the 1:20,000 fish and fish habitat reconnaissance level stream inventory project in lower Buck Creek watershed were: to review and summarize historical fisheries information for the study area, to describe fish distribution and... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish...