Detailed Fish Habitat, Riparian and Channel Assessment for Select Central Bul...
Land use activities have had a significant impact on many of the tributaries within the central Bulkley River watershed. Preliminary air photo analysis has indicated that high value fish habitat has been moderately to severely impacted in a large proportion... -
Zymoetz and Clore River Steelhead Trout: A Report on the 1978 and 1979 Sport ...
This paper presents data collected during a creel census conducted in the years 1978 and 1979, and includes information on angler harvest and success, and life histories of Zymoetz-Clore steelhead. -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en response in respect of the proposed Coastal GasLink pipeline project within... -
Upper Bulkley Fish and Aquatic Review: Summary of Data, Methodology, Threshol...
The Upper Bulkley Fish and Aquatic Review project produced a set of analyses focused on select pressure and quantity indicators as determined by the Wild Salmon Policy Strategy 2. Pressure Indicators included are Road Density, Riparian Disturbance, and... -
Upper Bulkley Fish and Aquatic Review: Summary of Data, Methodology, Results,...
The Upper Bulkley Fish and Aquatic Review project produced a set of analyses focused on select pressure and quantity indicators as determined by the Wild Salmon Policy Strategy 2. Pressure Indicators included are Road Density, Riparian Disturbance, and... -
Toboggan Creek Watershed Restoration Project
These reports present the information found during the Toboggan Creek Watershed Restoration Project. This project assessed the historical background of the watershed, including a review of fish, fish habitat, impacts, and water quality. Furthermore, the... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Pacific Trail Pipelines Project: Application to Amend Environmental Assessmen...
This environmental assessment, like the effects assessment contained in the original 2007 EAC Application, is a sustainability-based environmental assessment that considers the following five interconnected and interdependent "pillars": environment,... -
Pacific Trail Pipelines Project: Application No.4 to Amend Environmental Asse...
This environmental effects assessment, like the effects assessment provided in the 2007 EAC Application, is a sustainability-based environmental assessment that considers five interconnected and interdependent “pillars” which are environment, economy,... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,... -
Ongoing Legacy of Metal Mines on Babine Lake
An assessment of discharge regulation, aquatic monitoring, and aquatic impacts related to Bell and Granisle Mines. -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the construction of a Tailings Storage Facility, including tailings and seepage control dams,... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Maxan Watershed Stream Habitat Restoration and Enhancement Level 2 Design Rep...
AGRA Earth & Environmental Limited (AEE) was retained by Dz'ilh K'Az Kwa Development Corporation (DKK) to design stream habitat restoration and enhancement measures in the Maxan watershed. -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual Compe...
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas (KLNG) facility to the Spectra Energy Transmission BC pipeline facilities located... -
Fisheries Assessment of Proposed Rip Rap Sites from Km17 to Km25 Morice River...
Slope failures along this section have led to a number of proposed remedial works, including rip rap placement at sites identified by the Ministry of Environment, Lands and Parks (MOELP) and the Department of Fisheries and Oceans (DFO) staff as sensitive to... -
Dahlie Creek Salmonid Overwintering and Water Quality Studies: Interim Report
This document contains a detailed fish habitat, riparian, and channel assessment of Dahlie Creek. Low channel complexity, removal of riparian vegetation, culvert obstructions to fish passage, sedimentation, altered flow regime, and channelization were some...