Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency... -
Canadian Technical Report of Fisheries and Aquatic Sciences
Technical reports contain scientific and technical information that contributes to existing knowledge but which is not normally appropriate for primary literature. Technical reports are directed primarily toward a worldwide audience and have an... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Skeena Salmon Conservation Units: Key Population and Habitat Points
Key points on population and habitat of Skeena salmon conservation units. -
Skeena River Estuary Assessment Project
This project assessed key pressures on salmon habitat in the Skeena River estuary. The authors used benchmarks to assess the status of salmon habitat indicators and identified critical knowledge gaps and future monitoring needs. -
Salmon Science as Related to Proposed Development in the Skeena River Estuary
A collaborative research team of academic and First Nation scientists has been studying the Skeena River estuary ecosystem and its juvenile salmon. After 4 years, 100 boat days, 500 net hauls, and nearly 200,000 fish sampled, this program represents the... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Marine Fish and Fish Habitat Technical Data Report: Proposed Aurora LNG Project
This Technical Data Report (TDR) presents information on existing conditions for marine fish and fish habitats within local and regional assessment areas. The purpose of the TDR is to support the Project’s Application for an Environmental Assessment... -
Juvenile Salmonid Habitat Utilization in the Skeena River Estuary
This report examines the salmon habitat utilization of five species of Pacific salmon in the greater Skeena River estuary. In particular, interest is given in salmon habitat utilization in light of several large-scale industrial development projects pending... -
Juvenile Salmon Usage of the Skeena River Estuary
This paper examines the geographic and temporal habitat utilization of juvenile anadromous salmon in the greater Skeena estuary in relation to the footprints of the proposed industrial development projects. These data can help illuminate the current status... -
Aurora LNG Freshwater Fish and Fish Habitat Final Report 2014-2015
The objective of the Freshwater Fish and Fish Habitat Program was to conduct field surveys of streams within and adjacent to the Project area (i.e., location of LNG plant infrastructure and ancillary facilities on Digby Island). This report presents the... -
Application for Enbridge Northern Gateway Project Certificate of Public Conve...
This report summarizes the salmon-bearing regions that would be intersected by the Enbridge Northern Gateway Project. It analyzes the potential effects of pipeline spills and development to spawning and rearing grounds and to migration. -
2018-2022 Implementation Plan - Wild Salmon Policy
The WSP lays out six strategies to restore and maintain healthy and diverse salmon populations and habitats, which can be grouped into three interrelated themes: Assessment, Maintaining and Rebuilding Stocks, and Accountability.