Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Aurora LNG Freshwater Fish and Fish Habitat Final Report 2014-2015
The objective of the Freshwater Fish and Fish Habitat Program was to conduct field surveys of streams within and adjacent to the Project area (i.e., location of LNG plant infrastructure and ancillary facilities on Digby Island). This report presents the... -
Application for Enbridge Northern Gateway Project Certificate of Public Conve...
This report summarizes the salmon-bearing regions that would be intersected by the Enbridge Northern Gateway Project. It analyzes the potential effects of pipeline spills and development to spawning and rearing grounds and to migration.