-
Biophysical, Socio-Economic, and Regional Data and Information (BERDI)
BERDI – a data bank for Biophysical, (Socio)Economic, and Regional Data and Information (pronounced “birdie”) - was created to make data collected by the Canada Energy Regulator (CER) more accessible to the public. Since 1965, the CER has collected... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Skeena Salmon: Lake Sockeye Conservation Unit Snapshot: Lakelse
This habitat report card was developed by the Pacific Salmon Foundation with technical support from ESSA Technologies. This project summarizes pressures on habitat used by Skeena sockeye for migration, spawning, and rearing, as well as their relative... -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en response in respect of the proposed Coastal GasLink pipeline project within... -
Wet'suwet'en Submission to the Canadian Environmental Assessment Agency - Pac...
This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific NorthWest LNG project near LeLu Island. -
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect of the proposed Northern Gateway project within Wet'suwet'en territory. The... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Skeena Historical Land Use Change and Ecological Function Project: Final Report
The following report describes the final phase (Phase II) of the collaborative WWF-UBC Skeena Historical Land Use Change and Ecological Function Project. This project entailed collecting air photos at two study areas within the Skeena River watershed in... -
Potential Effects of an Oil Pipeline Rupture on Reach 2 of Morice River: A Su...
This submission focuses on a portion of the pipeline route that is located adjacent to Morice River, 70 km south of Smithers. It examines the implications of a pipeline rupture and subsequent clean-up efforts to river processes, fish and fish habitat, and... -
Pacific Trail Pipelines Project: Application to Amend Environmental Assessmen...
This environmental assessment, like the effects assessment contained in the original 2007 EAC Application, is a sustainability-based environmental assessment that considers the following five interconnected and interdependent "pillars": environment,... -
Pacific Trail Pipelines Project: Application No.4 to Amend Environmental Asse...
This environmental effects assessment, like the effects assessment provided in the 2007 EAC Application, is a sustainability-based environmental assessment that considers five interconnected and interdependent “pillars” which are environment, economy,... -
Pacific Northern Gas Looping Project: Project Description
This report summarizes the Pacific Northern Gas Looping Project by describing the project, areas of federal interest, the resource and material requirements, indigenous engagement, public engagement, project setting, and potential project effects. -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the construction of a Tailings Storage Facility, including tailings and seepage control dams,... -
Marine Sediment and Water Quality Technical Data Report: Proposed Aurora LNG ...
To facilitate safe manoeuvring and berthing of vessels, capital dredging of marine sediment and rock will be required at two berth areas, located south of Frederick Point, and at the Materials Off-Loading Facility. The data presented herein will be used to... -
Letter from Canadian Environmental Assessment Agency Fisheries for the Aurora...
The Canadian Environmental Assessment Agency (the Agency) is writing to inform Fisheries and Oceans Canada that in performing the duties and functions of the responsible authority for the environmental assessment (EA) of the proposed Aurora LNG Project (the... -
Fish Monitoring Studies in Buck, Foxy and Crow Creeks and Goosly Lake
These reports present the results of the 2012 and 2017 fish monitoring programs conducted in the vicinity of Equity Mine near Houston BC.