Morice Water Monitoring Trust: Annual Monitoring Plans
The Annual Monitoring Plan sets out the year’s proposed activities and budget which are created from the MWMT Monitoring Framework and is consistent with the MWMT Agreement. -
Water Quality Effectiveness Evaluations and Fish Passage Culvert Inspection
Water Quality Effectiveness Evaluations arose out of the Forest and Range Practices Act as a way of measuring the effectiveness of the Act in accomplishing its forest stewardship objectives. The field procedure for Water Quality Effectiveness Evaluation... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency... -
2015 Assessment Report on the Topley Richfield Property
Exploration during 2015 was designed to located and sample all historic showings and to map the old trenches, shafts and declines within the property. With an estimated 20,000 tons of dump material situated on the Main Zone and another 47 tons on the West... -
Skeena Salmon: Lake Sockeye Conservation Unit Snapshot: Lakelse
This habitat report card was developed by the Pacific Salmon Foundation with technical support from ESSA Technologies. This project summarizes pressures on habitat used by Skeena sockeye for migration, spawning, and rearing, as well as their relative... -
Impacts of LNG Development to Salmon Habitat on Lelu Island and Flora Bank
This report outlines the unaddressed issues that remain after the mitigation proposal presented by Petronas for a suspension bridge over Flora Bank. -
Environmental and Socio-Economic Effects Report
This report is part of BC Hydro's transmission line from Terrace to Kitimat planning process to identify potential Project effects and proposed mitigation for biophysical or socio-economic study topic. -
Cranberry Sustainable Resource Management Plan
The Cranberry Sustainable Resource Management Plan (SRMP) is a landscape level plan developed to address sustainable management of land, water and resources in the Cranberry Landscape Unit which is described as Timber Supply Block G, a portion of Timber... -
Babine Watershed Indicator Data Summary Report
This report, commissioned by the Babine Watershed Monitoring Trust, is part of the mandate to monitor the effectiveness of land management plans covering the Babine Watershed. The effectiveness indicators analyzed are: for Biodiversity objective -deciduous... -
An Investigation into the Feasibility of Modifying Derelict Dams to Improve S...
Skeena Fisheries Commission (SFC), in partnership with the Lax Kw’alaams Fisheries Program conducted a feasibility assessment to determine whether salmon productivity in the Kloiya River and Rainbow Lake watersheds could be improved by modifying a series of... -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en response in respect of the proposed Coastal GasLink pipeline project within... -
Wet'suwet'en Submission to the Canadian Environmental Assessment Agency - Pac...
This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific NorthWest LNG project near LeLu Island. -
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect of the proposed Northern Gateway project within Wet'suwet'en territory. The... -
Westcoast Connector Gas Transmission Project: Conceptual Freshwater Fish Habi...
This freshwater CFHOP outlines the strategy and framework for development of the Final Fish Habitat Offsetting Plan (FHOP). A marine CFHOP companion document has also been prepared. The FHOP will be developed via discussions with regulatory agencies and... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where... -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Surface Freshwater Quality Technical Data Report: Proposed Aurora LNG Project
This technical data report presents the results of the surface freshwater acidification and eutrophication assessment including a description of field surveys, methods, and baseline data describing existing conditions.