-
Suspended Sediment Telkwa River Watershed
In general, the study aimed to determine the timing of suspended sediment transport within the Telkwa watershed and isolate the sediment sources. This report presents sediment data collected between April and October 1990, preliminary conclusions, and... -
Hydrolic and Geomorphic Considerations for Silvicultural Investments on the L...
Hydrologic and geomorphic considerations for silvicultural investments on the lower Skeena River floodplain. This report evaluates four inter-related components essential for silvicultural planning on the lower Skeena River floodplain: biophysical...