Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and the lower Telkwa... -
Fish Population Monitoring in Foxy and Buck Creeks
Sampling at fish index sites was conducted at five locations in Foxy and Buck creeks for Equity Silver Mines Ltd. from September 1988 to 1991. -
Consequences of Unregulated Release of Raw Acid Mine Drainage into the Bulkle...
Approximately 800 000 m3 of acid mine drainage (AMD) is generated per year at the Equity Silver Mine southeast of Houston. This AMD would have devastating effects on the Bulkley River if it was allowed to flow untreated from the property for a prolonged... -
Assessment of Steelhead Enhancement Opportunities in the Morice River System
Juvenile salmonid populations in two tributary streams to the Morice River system, Owen and Lamprey Creeks, were assessed by the Fish Habitat Improvement Section in the fall of 1980. Objectives were directed at steelhead enhancement opportunities in the two... -
Assessment of Benthic Invertebrate and Juvenile Fish Populations in Foxy and ...
Field studies assessing fish and benthic invertebrate populations in Foxy Creek, a small stream located in north central British Columbia near Houston, were undertaken in late August and September 1984. As well, benthic invertebrate populations were... -
Upper Bulkley River Reconnaissance with Reference to Juvenile Steelhead Carry...
The objective of this report is to outline present standing crop and an estimate of carrying capacity for juvenile steelhead in the Bulkley-Morice River system. -
Telkwa Coal Project Aquatic Resource Assessment (1985)
This report is the result of studies undertaken in 1984 that evaluated aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and... -
Environmental Studies Associated with the Proposed Kemano Completion Hydroele...
This dataset has no description