Water Quality Effectiveness Evaluations and Fish Passage Culvert Inspection
Water Quality Effectiveness Evaluations arose out of the Forest and Range Practices Act as a way of measuring the effectiveness of the Act in accomplishing its forest stewardship objectives. The field procedure for Water Quality Effectiveness Evaluation... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Cutthroat Fishery - Lakelse River/Lake
A compilation of various studies and emails between the researchers and the Ministry of Environment in regards to Lakelse Lake and River assessment through the years of 1969-2001. -
Water Resources Service Pollution Control Branch - Lakelse Lake Water Quality...
A comprehensive water quality limnology study in Lakelse Lake was completed by the Pollution Control Branch in 1973 - 74. The expressed purpose of this study, as developed by the North Region Pollution Control Branch in conjunction with Projects and... -
Water Quality: Second Report on Chemical Sensitivity of BC Lakes to Acidic In...
This second summary document provides information (pH, alkalinity, calcium, and sensitivity rating) for about 760 lakes sampled between 1977 and 1986. This represents about 3.5% of the estimated 22,000 lakes in British Columbia. It provides locations where... -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use Activit...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and hatchery fish, primarily coho, pink, steelhead and Dolly Varden, with smaller... -
Water Quality and Accumulation of Periphyton (attached algae) in the Bulkley ...
In recent years, studies in the upper Bulkley River upstream of Houston have noted elevated levels of bacteria, nutrients and attached algae (periphyton). A 1992 fisheries study in the upper Bulkley at Houston found fish species composition was dominated by... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Sediment Source Mapping, Detailed Channel Assessment, and Reconnaissance Sedi...
Sediment source mapping, detailed channel assessment, and reconnaissance sediment budget for Williams Creek for the period 1949 to 2001. This study has two components: (1) sediment source mapping and reconnaissance sediment budgeting upslope of the alluvial... -
Results of the Kloiya River Resistivity Counter
The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began investigating the potential of using the Kloiya as an index stream for monitoring... -
Residual Impacts on water quality and sockeye salmon fry habitat: Twenty year...
The Morrison River enters Babine Lake from the northwest. Morrison and Tahlo Lakes are important sockeye (Oncorhynchus nerka) nursery lakes that collectively host the second largest wild sockeye population in the Skeena. Downstream migration of juvenile... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Re-sampling of Pete...
This report summarizes past fish inventory efforts and results in context with data collected during re-sampling to present a comprehensive picture of fish distribution in the upper Peter-Aleck drainage. -
Prince Rupert Area Coastal Fish Habitat Bibliography
A bibliography of existing coastal information describing habitat and biota. -
Preliminary Assessment of Overwintering Habitat in the Morice Watershed
This preliminary data report examines potential indicators of overwintering habitat quality and some potential factors which may affect the the overwintering habitat quality. -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the...