Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Westcoast Energy Inc Fireweed Offload Pipeline Project: Fisheries Habitat Ass...
This pre-impact habitat assessment was conducted on June 30, 1994 to identify and evaluate fish habitat along the proposed route associated with this project. -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use Activit...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and hatchery fish, primarily coho, pink, steelhead and Dolly Varden, with smaller... -
Water Quality and Accumulation of Periphyton (attached algae) in the Bulkley ...
In recent years, studies in the upper Bulkley River upstream of Houston have noted elevated levels of bacteria, nutrients and attached algae (periphyton). A 1992 fisheries study in the upper Bulkley at Houston found fish species composition was dominated by... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological Investigatio...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed Telkwa Coal Project near Telkwa, B.C. The work program for this investigation was... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Skeena Cellulose Inc. Environmental Effects Monitoring (EEM) Cycle Three Desi...
The purpose of this design document is to summarize and update mill process information and results from previous cycles and other studies, and to provide a rationale for the design of the Cycle Three program. Five elements of the EEM program will be... -
Reconnaissance Inventory of Smokee Lake
This report contains information about Smokee Lake habitat quality. The data presented in this document includes information regarding aquatic vegetation, terrain features, physical and chemical water characteristics, pollution, and fish habitation. In... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and assessment system for the recently established Morice Water Management Area (MWMA). -
Morice Land and Resource Management Plan
The Morice LRMP provides policy direction on the management of land and resources in the Morice LRMP area, and provides direction for the establishment of landscape level legal objectives. There are four main sections to the plan: General Management... -
Marine Sediment and Water Quality Technical Data Report: Proposed Aurora LNG ...
To facilitate safe manoeuvring and berthing of vessels, capital dredging of marine sediment and rock will be required at two berth areas, located south of Frederick Point, and at the Materials Off-Loading Facility. The data presented herein will be used to... -
Literature Review and Data Summary of Studies Related to Bell Mine, Babine Lake
This report summarizes available information on selected chemical and physical parameters of Babine Lake. The information has been reviewed in order to understand long term effects of a possible permanent copper mine tailings pond supernatant discharge into... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s distribution of information during the Application Review; report on whether the... -
Conceptual Fish Habitat Offsetting Plan: Proposed Aurora LNG Project
This Conceptual Fish Habitat Offsetting Plan marks the first step along the path to developing a Final Fish Habitat Offsetting Plan in support of an application for a Fisheries Act Authorization. More immediately, this plan is intended to support Aurora... -
A Preliminary Evaluation of the Environmental Impact of Mining, Community Dev...
An ecological study to assess the impact of environmental changes on the Babine sockeye production is currently being conducted under the auspices of the Babine Watershed Change Program. Specifically the Environmental Quality Unit of the Northern Operations... -
Excel Energy Inc: Birch Oil Sales Pipeline Pre-Impact Fisheries Habitat Asses...
Excel Energy Inc. planned to construct an oil pipeline in the area of the Birch oil field in northeastern British Columbia. The project involved the construction of approximately 36 kilometres of pipeline for the purpose of transporting crude oil from...